1725 ST ANDREW ST is in Central City, zoned HU-RM1 (Older neighborhoods, low-density multi-family housing up to three stories). The city has 6 permits on record here; the most recent, a construction loop permit, was filed in July 2023. 2 are still open. On this block in the past year: 14 requests to 311 and 46 calls to police.
- Zoning
- HU-RM1
- Historic district
- None
- National Register
- Central City Historic District
- Council district
- B
- Ward
- 10
- Lot size
- 3,206 sq ft
- Parcel
- 41186245
Everything on record here
6 records, newest first · 2 open
-
Permit Construction Loop Permit Cancelled
New house
- Permit
- 23-18750-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $100,112
- Fees
- $40
- Contractor
- Rolando J Sandoval
- Days from application to issue
- 3
- Expires
- Jan 14, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Cancelled
New house
- Permit
- 23-18017-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $100,112
- Fees
- $150
- Contractor
- Rolando J Sandoval
- Days from application to issue
- 8
- Expires
- Jan 12, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit HDLC COA Permit Cancelled
New Construction Planned Unit Development (P.U.D.) on a subdivided lot (originally 1721-35 St. Andrew St. and to be changed to 1725 St. Andrew St. Units A-P). Building 3 is a single-family detached cottage (Unit P) and is part of a Planned Unit Development project with 16 total units. Building 3 is one of four separate buildings on this P.U.D. project site. Detached cottage is 1.5 stories, with a driveway, and contains 2 bedrooms & 2 bathrooms. Construction system consists of heavy timber structural frame, concrete grade beam foundation, Structurally Insulated Panels (SIP), & Steel Stud walls, floors, and roof. Painted fiber cement board exterior wall finish and standing seam metal roof.
- Permit
- 21-32502-HDLC
- Type
- HDLC COA
- Work
- HDLC COA
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- Jun 2, 2022
-
Permit HDLC COA Permit Cancelled
New Construction Planned Unit Development (P.U.D.) on a subdivided lot (originally 1721-35 St. Andrew St. and to be changed to 1725 St. Andrew St. Units A-P). Building 2 consists of seven (7) attached townhouse units (I-O) and is part of a Planned Unit Development project with 16 total units. Building 2 is one of four separate buildings on this P.U.D. project site. Attached Townhomes are 2 stories, with ground floor garage and driveway, and contain 2 bedrooms & 2 bathrooms each. Construction system consists of heavy timber structural frame, concrete grade beam foundation, CMU wall base, Structurally Insulated Panels (SIP), & Steel Stud walls, floors, and roof. Painted fiber cement board exterior wall finish and standing seam metal roof. Attached townhomes are sprinklered and each unit is separated by 1-hour rated demising walls.
- Permit
- 21-32496-HDLC
- Type
- HDLC COA
- Work
- HDLC COA
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- May 29, 2022
-
Permit New Construction Permit Issued
New Construction Planned Unit Development (P.U.D.) on a subdivided lot (originally 1721-35 St. Andrew St. and to be changed to 1725 St. Andrew St. Units A-P). Building 3 is a single-family detached cottage (Unit P) and is part of a Planned Unit Development project with 16 total units. Building 3 is one of four separate buildings on this P.U.D. project site. Detached cottage is 1.5 stories, with a driveway, and contains 2 bedrooms & 2 bathrooms. Construction system consists of heavy timber structural frame, concrete grade beam foundation, Structurally Insulated Panels (SIP), & Steel Stud walls, floors, and roof. Painted fiber cement board exterior wall finish and standing seam metal roof.
- Permit
- 21-32502-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $202,489
- Fees
- $1,278
- Contractor
- Concordia LLC, Pace Group LLC, A-1 Developers LLC
- Days from application to issue
- 545
- Expires
- Nov 18, 2023
- Application submitted
- Zoning review
- Application review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Permit New Construction Permit Issued
New Construction Planned Unit Development (P.U.D.) on a subdivided lot (originally 1721-35 St. Andrew St. and to be changed to 1725 St. Andrew St. Units A-P). Building 2 consists of seven (7) attached townhouse units (I-O) and is part of a Planned Unit Development project with 16 total units. Building 2 is one of four separate buildings on this P.U.D. project site. Attached Townhomes are 2 stories, with ground floor garage and driveway, and contain 2 bedrooms & 2 bathrooms each. Construction system consists of heavy timber structural frame, concrete grade beam foundation, CMU wall base, Structurally Insulated Panels (SIP), & Steel Stud walls, floors, and roof. Painted fiber cement board exterior wall finish and standing seam metal roof. Attached townhomes are sprinklered and each unit is separated by 1-hour rated demising walls.
- Permit
- 21-32496-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $748,141
- Fees
- $4,554
- Contractor
- Concordia LLC, Pace Group LLC, A-1 Developers LLC
- Days from application to issue
- 545
- Expires
- Nov 18, 2023
- Application submitted
- Zoning review
- Application review
- Plan review
- Permit approved
- Issue date