1644 State Street is in Audubon, zoned HU-RS (Older neighborhoods, single-family homes). It is in the Uptown historic district under partial HDLC control, where demolition needs HDLC review. The city has 3 permits on record here; the most recent, a permanent generator permit, was filed in October 2023. 1 is still open. On this block in the past year: 8 requests to 311 and 0 calls to police.

Zoning
HU-RS
Historic district
Uptown (Partial control)
National Register
Uptown New Orleans Historic District
Council district
A
Ward
14
Lot size
6,551 sq ft
Parcel
41188152

Everything on record here

3 records, newest first · 1 open

  1. Permit Permanent Generator Permit Finaled

    Installing a 24kW generac Generator and a 200 amp transfer switch for emergency backup power.

    Permit
    23-27609-EGEN
    Type
    Permanent Generator
    Work
    Permanent Generator
    Estimated cost (applicant’s figure)
    $18,600
    Fees
    $103
    Contractor
    Jeremiah Alexander Johnson
    Days from application to issue
    4
    Expires
    Apr 13, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Mechanical Fuel Gas Permit Finaled

    Installing a 24kW Generac Generator and a 200 amp transfer switch for emergency backup power.

    Permit
    23-27600-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $18,600
    Fees
    $80
    Contractor
    Ready Power, LLC
    Days from application to issue
    2
    Expires
    Apr 11, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Accessory Structure Permit Issued

    Installing a 24kW Generac Generator and a 200 amp transfer switch for emergency backup power.

    Permit
    23-25408-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $18,600
    Fees
    $215
    Contractor
    Ready Power LLC
    Days from application to issue
    25
    Expires
    Apr 9, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop