Plum Orchard
4815 Eastview Drive is in Plum Orchard, zoned S-RD (Newer neighborhoods, two-family homes and townhouses). The city has 2 permits on record here; the most recent, a demolition permit, was filed in November 2010. 2 are still open. A demolition permit was filed in November 2010. There were 4 past code enforcement cases, the latest in April 2019, all closed. On this block in the past year: 7 requests to 311 and 22 calls to police.
- Zoning
- S-RD
- Historic district
- None
- Council district
- E
- Ward
- 9
- Lot size
- 8,621 sq ft
- Parcel
- 41198939
Everything on record here
6 records, newest first · 2 open
-
Code enforcement Case 19-03283-MPM Closed
The property was inspected on 04/25/2019 with a finding of "Violation: No WIP". The file was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 160 Weeds and Plant Growth
- Violation: 161 Rodent Harborage
-
Code enforcement Case 17-14030-MPM Closed
The property was inspected on 01/08/2018 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
-
Permit Demolition Inspection - Completed No Requirements
Demolish single-family house to grade.
- Permit
- 10BLD-06643
- Type
- Demolition
- Work
- Demolition
- Estimated cost (applicant’s figure)
- $5,800
- Fees
- $125
- Days from application to issue
- 0
Placed here by the parcel’s own address from “4815 East View Dr”.
-
Code enforcement Case HCEC-10-02487 Closed
The case was filed on 11/03/2010 but has since been closed without further action.
- Inspection: Inspection In Compliance
-
Code enforcement Case ENVHADJ-20051159SN Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Permit Electrical Repair / Replacement / Addition Inspection - Completed
SIX MONTH VACANCY
- Permit
- 05ELC-04761
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- Curtis & Son's Electric
- Days from application to issue
- 10