Central Business District
328 Lafayette Street is in Central Business District, zoned CBD-6 (Downtown neighborhood mixed use, including the Warehouse District). It is in the Warehouse District historic district under full HDLC control, so most exterior changes need approval first. The city has 9 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in November 2026. 7 are still open. On this block in the past year: 3 requests to 311 and 7 calls to police.
- Zoning
- CBD-6
- Historic district
- Warehouse District (Full control)
- National Register
- Upper Central Business District
- Council district
- B
- Ward
- 3
- Lot size
- 1,719 sq ft
- Parcel
- 41201587
Everything on record here
10 records, newest first · 7 open
-
Permit Electrical Service / Circuit / Feeder Permit Issued
New owner wants to relocate existing power to accommodate new equipment and lighting
- Permit
- 26-32417-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $2,000
- Fees
- $118
- Contractor
- Michael Forester, Lisa Monique Pressley
- Days from application to issue
- 5
- Expires
- May 9, 2027
- Electrical Paid
- Final Electric
- UG Electrical
- Application Submitted Complete
- Application submitted
- Application Review Complete
- Permit Approved Complete
- Electrical Complete
- Application review
- Permit approved
- Permit Issued Complete
- Issue date
- Rough Electrical Passed
-
Permit Plumbing Permit Permit Issued
Install new plumbing system for four toilets, four lavatories, four floor drains, three AC P-traps, five showers, two tubs, one water heater, one circulating system and one 4" Double Check Backflow Preventer.
- Permit
- 26-29733-PLMB
- Type
- Plumbing Permit
- Work
- Plumbing Permit
- Estimated cost (applicant’s figure)
- $0
- Fees
- $220
- Contractor
- Noel Anthony Irsch Jr
- Days from application to issue
- 5
- Expires
- Apr 13, 2027
- SWB Filing Fee Paid
- Plumbing Tie In
- Plumbing Final
- Application Submitted Complete
- Application Review (SWB) Complete
- SWBNO Plumbing Intake Approved
- Permit Approved Complete
- Permit Issued Complete
- SWBNO Plumbing Approval Approved
- Plumbing Underground Passed
- Plumbing Rough In/ Top Out Scheduled
-
Permit Mechanical Fuel Gas In Review
Install one electric water heater
- Permit
- 26-29724-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $43,268
- Fees
- $20
- Contractor
- Noel Anthony Irsch Jr
- Water Heaters Paid
- Rough Mech Gas Comm
- Water Heater
- Application Submitted Complete
- Application Review Complete
- Permit Approved Complete
- Mechanical Permit Review Complete
- Mechanical Permit Review Pending
- HDLC Mechanical Exterior Complete
- Application submitted
- Application review
- Permit approved
-
Permit Renovation (Non-Structural) Permit Issued
Part 1: Remove interior non-structural partition walls and carpeting to create open office plan. Part 2: Interior Alterations to an existing three-story Group B Office Building for conversion to a day spa with treatment, recovery, sauna, bath, cryotherapy, changing, and support spaces. Work includes interior partitions, doors, finishes, plumbing fixtures, lighting, mecahnical systems, accessibility improvements, and modifications to existing fire sprinkler and fire alarm systems. **NO EXTERIOR WORK APPROVED UNDER THIS PERMIT
- Permit
- 26-13965-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $152,242
- Fees
- $978
- Contractor
- Forster Construction Services, LLC
- Days from application to issue
- 26
- Expires
- Dec 2, 2026
- Application submitted
- Application review
- Issue date
- First inspection
- Zoning review
- Plan review
- Permit approved
-
Permit HDLC COA Permit Finaled
Remove vegetation from front brick masonry facade parapet area, remove loose and deteriorated mortar with hand tools and re-point with mortar consisting of 1 part Portland cement, 3 parts lime, and 9 parts sand.
- Permit
- 21-28213-HDLC
- Type
- HDLC COA
- Work
- HDLC COA
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- Apr 8, 2022
-
Permit HDLC COA Permit Finaled
Relocate existing stair tower roof A/C Condensers to main roof. Remove CMU existing side walls of stair tower and replace with 6" metal stud framing, exterior gyp sheathing and exterior stucco system. Construct 6" metal stud rear exterior wall of stair tower and clad with exterior water proof system. Install 5/8" GWB to interior of metal stud walls.
- Permit
- 21-25878-HDLC
- Type
- HDLC COA
- Work
- HDLC COA
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- Mar 16, 2022
-
Permit Renovation (Non-Structural) Permit Issued
Relocate existing stair tower roof A/C Condensers to main roof. Remove CMU existing side walls of stair tower and replace with 6" metal stud framing, exterior gyp sheathing and exterior stucco system. Construct 6" metal stud rear exterior wall of stair tower and clad with exterior water proof system. Install 5/8" GWB to interior of metal stud walls.
- Permit
- 21-25878-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $250,351
- Fees
- $2,349
- Contractor
- Forster Construction Services, LLC
- Days from application to issue
- 14
- Expires
- Mar 29, 2022
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Permit Renovation (Non-Structural) Application Acceptance - Approved No Review
REPAIR/REPLACE DECKING,SHEATHING, AND FELT PAPER AS NEEDED TO MATCH EXISTING,INSTALL GAF TIMBERLINE OR GRANDSLATE ASHPALT/FIBERGLASS ROF SHINGLES,REPAIR/REPLACE ROLL ROOFINGAS NEEDED TO MATCH EXISTING,REPAIR/REPLACE VENTS AS NEEDED TO MATCH EXISTING.
- Permit
- 09COM-01163
- Type
- Renovation (Non-Structural)
- Work
- NA
- Estimated cost (applicant’s figure)
- $0
- Fees
- $218
- Days from application to issue
- 5
-
Permit Mechanical Annual Fee Pending
- Permit
- 03MCH-03747
- Type
- Mechanical
- Work
- Moving Equipment Annual
- Estimated cost (applicant’s figure)
- $0
- Fees
- $70
-
HDLC review HDLC COA
Install one electric water heater
See this record on One Stop · checked Nov 13, 2026