Behrman

1 Life Center Drive is in Behrman, zoned S-RM1 (Newer neighborhoods, multi-family housing up to four stories). The city has 13 permits on record here; the most recent, a demolition permit, was filed in February 2020. 8 are still open. A demolition permit was filed in August 2020. There is 1 open code enforcement case. On this block in the past year: 1 request to 311 and 0 calls to police.

Zoning
S-RM1
Historic district
None
Council district
C
Ward
15
Lot size
212,066 sq ft
Parcel
41204867

Everything on record here

19 records, newest first · 9 open

  1. Code enforcement Case 26-01821-MPM Hearing

    A hearing was held on 10/06/2026 with a result of "Reset: Insufficient Notice" and was reset to 12/07/2026.

    1. Inspection
    2. Title Research
    3. Hearing
    4. Judgment
    5. In Compliance
    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 158 Grading
    4. Violation: 159 Driveways
    5. Violation: 159 Sidewalks
    6. Violation: 160 Weeds and Plant Growth
    7. Violation: 161 Rodent Harborage
    8. Violation: 163 Fences and Walls
    9. Violation: 182 Gates
    10. Inspection: Posting of Notice of Noncompliance Violation: No WIP
    11. Inspection: CE Compliance Inspection Violation: No WIP
    12. Inspection: CE Inspection Supervisor Review Complete
    13. Inspection: Posting of Hearing Notice Violation: No WIP
    14. Inspection: Posting of Hearing Notice Violation: No WIP
    15. Hearing: Initial Hearing Guilty
    16. Inspection: Inspection Violation: No WIP
    17. Hearing: Reset Hearing Reset: Insufficient Notice
    18. Hearing: Reset Hearing Result Pending

    The city links this case to permit 20-04381-DEMO.

  2. Code enforcement Case 26-01735-MPM Closed

    The case was filed on 02/13/2026 but has since been closed without further action.

    The city links this case to permit 20-04381-DEMO.

  3. Code enforcement Case 21-06844-MPM Closed

    The property was inspected on 11/30/2023 with a finding of "Violation: No WIP". The file was subsequently closed.

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 160 Weeds and Plant Growth
    4. Violation: 161 Rodent Harborage
    5. Inspection: Inspection Violation: No WIP
    6. Violation: 157 Sanitation
    7. Violation: 160 Weeds and Plant Growth
    8. Violation: 161 Rodent Harborage
    9. Violation: 163 Fences and Walls

    The city links this case to permit 20-04381-DEMO.

  4. Permit Demolition Permit Issued

    DEMOLITION OF CHURCH STRUCTURE DOWN TO CONCRETE SLAB

    Permit
    20-04381-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $230
    Days from application to issue
    175
    Expires
    Feb 10, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  5. Permit Demolition Other

    Demolition of church structure down to concrete slab

    Permit
    19-36171-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,500
    Fees
    $150
    Contractor
    Hamp's Enterprises Inc
    1. Application submitted

    See this permit on One Stop

  6. Permit Interior Demolition Other

    The existing former church structure (approximately 20,000 sf) has been damaged by storms over the past 10 years causing the church congregation to move from this site to another location. The owner would like to rebuild the church in place, but will need time to raise funds to produce a new building program for the site that will likely expand the uses to include a daycare facility and other compatible uses. In order to reuse the slab and superstructure of heavy gage steel, the selective demolition work of this application is intended to remove the entire exterior skin (brick and stucco) and metal roof material, as well as the interior metal stud and gypsum partitions leaving the structural steel and concrete slab in place. Billes Architect, LLC has been retained as the Architect of Record (AOR) and was asked to apply for the selective demolition permit as a first phase. The demolition of the materials named is a measure which will satisfy the Code Enforcement Department of the City and is intended to halt the fines being imposed for the current poor condition of the damaged structure and site clearing measures. The owner and AOR are planning to produce the full master plan and construction documents to rebuild the Church. These documents will include the Church assembly, choir, and pulpit areas as existed before, but will also include a multi-use facility for the congregation and community. Therefore, this is the first of several phases of redevelopment that the owner inten

    Permit
    19-27132-DEMI
    Type
    Interior Demolition
    Work
    Interior Demolition
    Estimated cost (applicant’s figure)
    $93,000
    Fees
    $525
    Contractor
    David Henderson
    1. Application submitted

    See this permit on One Stop

  7. Code enforcement Case 18-09029-MPM Closed

    A hearing was held on 07/08/2019 with a result of "Guilty".

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 159 Sidewalks
    4. Violation: 160 Weeds and Plant Growth
    5. Violation: 161 Rodent Harborage
    6. Violation: 163 Fences and Walls
    7. Violation: 167 Exterior Surfaces
    8. Violation: 167 Paint or Protective Treatment
    9. Violation: 167 Siding and Masonry
    10. Violation: 167 Metal Surfaces
    11. Violation: 171 Weatherboards
    12. Violation: 172 Roofs
    13. Violation: 181 Doors
    14. Inspection: Posting of Hearing Notice Violation: No WIP
    15. Hearing: Initial Hearing Guilty
    16. Inspection: Posting of Judgment Violation: No WIP
    17. Inspection: Posting of Notice of Daily Fines Hearing Violation: No WIP
    18. Hearing: Reset Hearing Guilty
    19. Inspection: Daily Fines Hearing Complete

    The city links this case to permit 20-04381-DEMO.

  8. Permit Construction Loop Permit Finaled

    Temporary pole

    Permit
    18-12197-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $750
    Fees
    $40
    Contractor
    Langdon Mickens
    Days from application to issue
    0
    Expires
    Oct 11, 2018
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  9. Permit Renovation (Non-Structural) Other

    Clean around building; repair 2 broken windows and 1 broken door. Electric Temp Pole. No use in occupancy. extend permit for 6 months until 9/14/2019

    Permit
    18-11036-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $2,075
    Fees
    $140
    Days from application to issue
    6
    Expires
    Oct 9, 2018
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  10. Permit Construction Loop Other

    temporary pole

    Permit
    18-10822-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $750
    Fees
    $40
    Contractor
    Mickens Langdon
    1. Application submitted

    See this permit on One Stop

  11. Code enforcement Case 15-09221-MPM Closed

    A hearing was held on 02/15/2016 with a result of "Guilty".

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 157 Sanitation
    3. Violation: 160 Weeds and Plant Growth
    4. Violation: 164 Motor Vehicles
    5. Violation: 167 Exterior Surfaces
    6. Violation: 167 Paint or Protective Treatment
    7. Violation: 167 Siding and Masonry
    8. Violation: 167 Metal Surfaces
    9. Violation: 171 Exterior Walls
    10. Violation: 172 Roofs
    11. Inspection: Posting of Hearing Notice Violation: No WIP
    12. Hearing: Initial Hearing Reset: Work In Progress
    13. Inspection: Reinspection Violation: No WIP
    14. Hearing: Reset Hearing Guilty
    15. Inspection: Posting of Judgment Violation: WIP

    The city links this case to permit 20-04381-DEMO.

  12. Code enforcement Case 13-01972-PNBL Closed

    A hearing was held on 09/05/2013 with a result of "Guilty: Public Nuisance".

    1. Inspection: Inspection Violation: No WIP
    2. Violation: 28-10 Paint / Protective Treatment
    3. Violation: 28-13 Siding
    4. Violation: 28-14 Roof
    5. Violation: 28-15 Boarded and Secured
    6. Violation: 28-20 Rodent Harborage
    7. Violation: 28-21(a) Fences and Walls
    8. Violation: 28-22 Motor Vehicles
    9. Violation: 28-25 Fascia Boards
    10. Violation: 28-33 Duty to Mow Grass
    11. Violation: 28-33 Duty to Remove Trash and Debris
    12. Inspection: Posting of Hearing Notice Violation: No WIP
    13. Hearing: Initial Hearing Guilty: Public Nuisance
    14. Inspection: Posting of Judgment Violation: No WIP
  13. Permit Certificate of Occupancy Certificate Issued No Meter

    Install 3 temporary portable buildings and 1 tent for use as church offices and fellowship hall. This Temp. Cert. of Occ. is valid for 1 year from Date of issuance.

    Permit
    09OCC-00513
    Type
    Certificate of Occupancy
    Work
    NA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $100
  14. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    ADDITION

    Permit
    07ELC-33121
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,443
    Contractor
    A-1 Elect Contr's
    Days from application to issue
    10
  15. Permit Construction Loop Application Acceptance - Approved

    TEMP POLE

    Permit
    07ELC-12705
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Cleveland A Francois Jr
    Days from application to issue
    10

    Placed here by a known alternate street name from “1 Life Center Blvd”.

  16. Permit Substantial Improvement Permit Issuance - Active

    CONSTRUCT NEW 2-STORY ADDITION TO EXISTING CHURCH AS PER PLANS.

    Permit
    07COM-00233
    Type
    Substantial Improvement
    Work
    NA
    Estimated cost (applicant’s figure)
    $5,500,000
    Fees
    $30,200
    Contractor
    Hco Incorporated
    Days from application to issue
    222
  17. Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved

    temp pole

    Permit
    06ELC-28028
    Type
    Electrical Repair / Replacement / Addition
    Work
    Repair-Replacement-Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Jabeau Electric LLC
    Days from application to issue
    10

    Placed here by a known alternate street name from “1 Life Center Blvd”.

  18. Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved

    temp pole

    Permit
    06ELC-28029
    Type
    Electrical Repair / Replacement / Addition
    Work
    Repair-Replacement-Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Jabeau Electric LLC
    Days from application to issue
    10

    Placed here by a known alternate street name from “1 Life Center Blvd”.

  19. Permit Construction Loop Application Acceptance - Approved

    reconnect

    Permit
    05ELC-11923
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Tony's Electric
    Days from application to issue
    10