Bywater

4019 Dauphine Street is in Bywater, zoned HMR-3 (Marigny, Tremé and Bywater single- and two-family homes, with some small multi-family buildings). It is in the Bywater historic district under full HDLC control, so most exterior changes need approval first. The city has 9 permits on record here; the most recent, an HDLC COA permit, was filed in June 2026. 6 are still open. A demolition permit was filed in March 2007. There was 1 past code enforcement case, the latest in October 2009, all closed. On this block in the past year: 3 requests to 311 and 2 calls to police.

Zoning
HMR-3
Historic district
Bywater (Full control)
National Register
Bywater Historic District
Council district
C
Ward
9
Lot size
4,871 sq ft
Parcel
41207471

Everything on record here

10 records, newest first · 6 open

  1. Permit HDLC COA Other

    A tree house for my niece

    Permit
    26-17454-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0

    See this permit on One Stop

  2. Permit Accessory Structure Application Accepted

    AFTER THE FACT A tree house for my niece

    Permit
    26-17454-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $5,000
    Fees
    $218
    1. Application submitted

    See this permit on One Stop

  3. Permit HDLC COA Permit Cancelled

    4019 Dauphine St: Treffinger Jeffrey, applicant; Fortuna LLC, Stephen C May, owner; New construction of a 2,565 SF two-story single family residence.

    Permit
    21-25396-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0

    See this permit on One Stop

  4. Permit New Construction Application Accepted

    Construct a 2565 square foot single family residence; partial second story. Front and rear porches plus off street, garage parking. Site is 25 feet wide and 159'-10" long.

    Permit
    21-25396-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $325,000
    Fees
    $3,015
    1. Application submitted

    See this permit on One Stop

  5. Permit HDLC COA Permit Issued

    New construction of a residential building.

    Permit
    19-27682-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    367
    Expires
    Mar 4, 2021

    See this permit on One Stop

  6. Permit New Construction Permit Cancelled

    This permit application is for the purpose of the ARC meeting.

    Permit
    19-27721-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $600,000
    Fees
    $5,490
    1. Application submitted

    See this permit on One Stop

  7. Permit New Construction Application Accepted

    This application if for the purpose of an ARC review.

    Permit
    19-27682-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $600,000
    Fees
    $5,490
    1. Application submitted

    See this permit on One Stop

  8. Code enforcement Case ENVHADJ-09-02780 Closed

    A hearing was held on 12/08/2009 with a result of "Found Guilty". The case was subsequently closed.

    1. Hearing: Initial Hearing Found Guilty

    The city links this case to permit 26-17454-HDLC.

  9. Permit Demolition Inspection - Completed No Requirements

    DEMOLITION OF HURRICANE DAMEAGE SINGLE RESIDENTIAL UNIT. THE CONTRACTOR TO REMOVE AND DISPOSE OF ALL DEBRIS WITHIN 72 HOURS AND HAVE FINAL INSPECTION OF THE SITE. A LICENSED PLUMBER MUST SECURE A SEPARATE PERMIT FROM THE SEWAGE AND WATER BOARD TO CAP OFF SEWER LINES AND REMOVE WATER METER PRIOR TO DEMOLITION.

    Permit
    07BLD-02207
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125
    Days from application to issue
    5
  10. Permit Demolition Application Acceptance - Approved No Review

    DEMOLISH HOUSE TO GRADE. ALL DEBRIS SHALL BE REMOVED WITHIN 72 HOURS OF COMPLETION.

    Permit
    06BLD-06607
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $125