922 Mandeville Street is in Marigny, zoned HMR-3 (Marigny, Tremé and Bywater single- and two-family homes, with some small multi-family buildings). It is in the Faubourg Marigny historic district under full HDLC control, so most exterior changes need approval first. The city has 4 permits on record here; the most recent, an HDLC COA permit, was filed in October 2026. 4 are still open. On this block in the past year: 5 requests to 311 and 2 calls to police.

Zoning
HMR-3
Historic district
Faubourg Marigny (Full control)
National Register
Faubourg Marigny Historic District
Council district
C
Ward
8
Lot size
4,479 sq ft
Parcel
41209023

Everything on record here

4 records, newest first · 4 open

  1. Permit HDLC COA Permit Issued

    Replace the incorrect, damaged, and improperly installed siding on the two side elevations only, using smooth 6 1/4" cement board siding with a 4 3/4" exposure. Apply two coats of finsih paint to the two side elevations and the rear of the house.

    Permit
    26-29511-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Apr 7, 2027
    1. Permit Case Created Complete
    2. Completeness Review Complete
    3. Certificate Drafted Complete
    4. Permit Issued Complete

    See this permit on One Stop

  2. Permit Renovation (Structural or Non-structural) In Review

    Replace the incorrect, damaged, and improperly installed siding on the two side elevations only, using smooth 6 1/4" cement board siding with a 4 3/4" exposure. Apply two coats of finsih paint to the two side elevations and the rear of the house. New plywood shall be fire-rated where the property is located within 3 ft from the property line.

    Permit
    26-29511-RENO
    Type
    Renovation (Structural or Non-structural)
    Work
    Renovation (Structural or Non-structural)
    Estimated cost (applicant’s figure)
    $38,030
    Fees
    $563
    Contractor
    John W Andrews III, LLC
    1. Building Unpaid
    2. Building Plan Review Unpaid
    3. HDLC Review Unpaid
    4. Final Inspection
    5. Rough Framing
    6. Application Submitted Complete
    7. Application submitted
    8. Permit Intake Complete
    9. Zoning Review Complete
    10. Parks and Parkways Tree Review Complete
    11. Zoning Complete
    12. Zoning review
    13. Application Review Complete
    14. Plan Review Complete
    15. Permit Approved Complete
    16. Sub-Permits Issued Complete
    17. Plan Review Complete
    18. Application review
    19. Plan review
    20. Permit approved

    See this permit on One Stop

  3. Permit HDLC COA Permit Issued

    Shutters

    Permit
    17-20225-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Dec 9, 2017

    See this permit on One Stop

  4. Permit HDLC COA Permit Issued

    Shutters

    Permit
    13-29821-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    8
    Expires
    Jan 16, 2014