Treme - Lafitte
1117 Governor Nicholls Street is in Treme - Lafitte, zoned HMC-2 (Marigny, Tremé and Bywater busier commercial streets). It is in the Tremé historic district under full HDLC control, so most exterior changes need approval first. The city has 53 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in July 2025. 4 are still open. There were 6 past code enforcement cases, the latest in January 2021, all closed. On this block in the past year: 12 requests to 311 and 17 calls to police.
- Zoning
- HMC-2
- Historic district
- Tremé (Full control)
- National Register
- Esplanade Ridge Historic District
- Council district
- C
- Ward
- 6
- Lot size
- 4,033 sq ft
- Parcel
- 41214130
Everything on record here
59 records, newest first · 4 open
-
Permit Electrical Service / Circuit / Feeder Permit Issued
Consolidating 6 meters into 1. The owner will be using the same address. We will need the permit sent to Entergy. Wiring both downstairs bathrooms according to plans
- Permit
- 25-22186-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $8,000
- Fees
- $52
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 105
- Expires
- May 4, 2026
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit Plumbing Permit Other
Installation of handicap bathroom fixtures on the ground floor with back water prevention. There will be a floor drain, toilet and lavatory
- Permit
- 25-19918-PLMB
- Type
- Plumbing Permit
- Work
- Plumbing Permit
- Estimated cost (applicant’s figure)
- $0
- Fees
- $100
- Contractor
- Horace C Bynum, Jr.
- Days from application to issue
- 10
- Expires
- Jan 11, 2026
-
Permit Mechanical Fuel Gas Permit Issued
Consolidating all gas meters into one
- Permit
- 25-19644-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $3,500
- Fees
- $30
- Days from application to issue
- 3
- Expires
- Jan 2, 2026
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit Electrical Repair / Replacement / Addition Other
Consolidating all electrical meters into one, Wiring both downstairs bathrooms according to plans 6 meters into 1 meter
- Permit
- 25-19643-ERPR
- Type
- Electrical Repair / Replacement / Addition
- Work
- Electrical Repair / Replacement / Addition
- Estimated cost (applicant’s figure)
- $8,000
- Fees
- $52
- Application submitted
- Application review
-
Permit Change of Address Other
24-32493-RNVN Business Use, Conversion from apartments to Hotel. ADD 1117 Governor Nicholls St New Orleans, LA 70116 KEEP 1117 Governor Nicholls St HM New Orleans, LA 70116 (AM13021511, GM18023651, 22297523) KEEP 1117 Governor Nicholls St FIRE PUMP New Orleans, LA 70116 (AM12895182) RETIRE 1117 Governor Nicholls St Unit 2A New Orleans, LA 70116 (AM14497587, 18014298, 22297524) RETIRE 1117 Governor Nicholls St Unit 2B New Orleans, LA 70116 (AM14497585, 18014307, 22297321) RETIRE 1117 Governor Nicholls St Unit 3A New Orleans, LA 70116 (AM14497588, GM18014306, 22297485) RETIRE 1117 Governor Nicholls St Unit 3B New Orleans, LA 70116 (AM14497586, GM18014302, 22297486) RETIRE 1117 Governor Nicholls St Unit 4A New Orleans, LA 70116 (AM14497538, GM18014297, 22297488) RETIRE 1117 Governor Nicholls St Unit 4B New Orleans, LA 70116 (AM14497537, GM18014303, 22297487)
- Permit
- 25-11477-ECOA
- Type
- Change of Address
- Work
- Change of Address
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 113
- Expires
- Feb 5, 2026
- Application submitted
- Permit approved
- Issue date
-
Permit Electrical Service / Circuit / Feeder Other
Install 3 phase 200 amp service for fire pump
- Permit
- 25-06674-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $100
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 7
- Expires
- Sep 10, 2025
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Other
Install 3 phase 200 amp service for fire pump
- Permit
- 24-35863-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $106
- Contractor
- Reinaldo Lopez
- Application submitted
-
Permit Electrical Service / Circuit / Feeder Other
Wiring single unit in multi-family dwelling according to plans with 125 amps and 18 circuits
- Permit
- 24-34715-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $132
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 12
- Expires
- May 25, 2025
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Other
Wiring single unit in multi-family dwelling according to plans with 125 amps and 18 circuits
- Permit
- 24-34714-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $132
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 12
- Expires
- May 25, 2025
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Other
Wiring single unit in multi-family dwelling according to plans with 125 amps and 18 circuits
- Permit
- 24-34713-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $132
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 12
- Expires
- May 25, 2025
- First inspection
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit Electrical Service / Circuit / Feeder Other
Wiring single unit in multi-family dwelling according to plans with 125 amps and 18 circuits
- Permit
- 24-34712-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $132
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 12
- Expires
- May 25, 2025
- First inspection
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit Electrical Service / Circuit / Feeder Other
Wiring single unit in multi-family dwelling according to plans with 125 amps and 18 circuits
- Permit
- 24-34710-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $132
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 12
- Expires
- May 25, 2025
- First inspection
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit Electrical Service / Circuit / Feeder Other
Wiring single unit in multi-family dwelling according to plans with 125 amps and 18 circuits
- Permit
- 24-34709-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $132
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 12
- Expires
- May 25, 2025
- First inspection
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit Electrical Service / Circuit / Feeder Other
House meter 60 amps 6 circuits
- Permit
- 24-34707-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $76
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 12
- Expires
- May 25, 2025
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit HDLC COA Permit Cancelled
Revisions to an existing apartment building into a hotel occupancy.
- Permit
- 24-32493-HDLC
- Type
- HDLC COA
- Work
- HDLC COA
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- May 7, 2025
-
Permit Renovation (Non-Structural) Permit Issued
Revisions to an existing apartment building into a hotel occupancy. *FINAL INSPECTION* FEMA elevation certificate BFE +3.46 and FEMA dry floodproofing certificate. Verify floodproofing up to +4.46 NAVD
- Permit
- 24-32493-RNVN
- Type
- Renovation (Non-Structural)
- Work
- Renovation (Non-Structural)
- Estimated cost (applicant’s figure)
- $49,500
- Fees
- $370
- Contractor
- Hermanos Rivera Construction LLC
- Days from application to issue
- 229
- Expires
- Dec 9, 2025
- Application submitted
- Zoning review
- Application review
- Plan review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Finaled
Installation of two 1-ton mini split systems for the stairs area
- Permit
- 24-22351-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $100
- Days from application to issue
- 4
- Expires
- Jan 23, 2025
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Dumpster/Construction Zone Permit Issued
This permit allows construction vehicle partking at 1117 Governor Nicholls St.
- Permit
- 24-03276-RCZD
- Type
- Dumpster/Construction Zone
- Work
- Dumpster/Construction Zone
- Estimated cost (applicant’s figure)
- $0
- Fees
- $315
- Contractor
- Hermanos Rivera Construction LLC
- Days from application to issue
- 73
- Expires
- Oct 15, 2024
-
Permit Construction Loop Permit Finaled
3-phase temporary pole
- Permit
- 23-31678-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $1,000
- Fees
- $40
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 5
- Expires
- May 21, 2024
- Application submitted
- First inspection
- Application review
- Permit approved
- Issue date
-
Permit Electrical Service / Circuit / Feeder In Review
Install 3 phase 200 amp service for fire pump add 2 circuits
- Permit
- 23-31155-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $106
- Contractor
- Reinaldo Lopez
- Application submitted
- Application review
-
Permit Moving Equipment Permit Finaled
Elevator Installation
- Permit
- 23-29846-MOVG
- Type
- Moving Equipment
- Work
- Moving Equipment
- Estimated cost (applicant’s figure)
- $0
- Fees
- $95
- Contractor
- Schindler Elevator Corporation
- Days from application to issue
- 281
- Expires
- Feb 6, 2025
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Cancelled
House meter. 60 amps and 6 circuits.
- Permit
- 23-19243-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $96
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 70
- Expires
- Mar 22, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Finaled
Installation of a 2.5-ton multi-zone heat pump mini split
- Permit
- 23-19123-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $11,833
- Fees
- $50
- Days from application to issue
- 74
- Expires
- Mar 25, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Finaled
Installation of a 2-ton multi-zone heat pump mini split
- Permit
- 23-19115-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $11,833
- Fees
- $50
- Days from application to issue
- 74
- Expires
- Mar 25, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Finaled
Installation of a 2.5-ton multi-zone heat pump mini split
- Permit
- 23-19112-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $11,833
- Fees
- $50
- Days from application to issue
- 74
- Expires
- Mar 25, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Finaled
Installation of a 2.5-ton multi-zone heat pump mini split
- Permit
- 23-19107-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $11,833
- Fees
- $50
- Days from application to issue
- 74
- Expires
- Mar 25, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Finaled
Installation of a 2.5-ton multi-zone heat pump mini split
- Permit
- 23-19104-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $11,833
- Fees
- $50
- Days from application to issue
- 74
- Expires
- Mar 25, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical HVAC Permit Finaled
Installation of a 2.5-ton multi-zone heat pump mini split
- Permit
- 23-19065-HVAC
- Type
- Mechanical HVAC
- Work
- Mechanical HVAC
- Estimated cost (applicant’s figure)
- $11,833
- Fees
- $50
- Days from application to issue
- 74
- Expires
- Mar 25, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Issued
Wiring single unit in multi-family dwelling according to plans with 125 amps and 18 circuits
- Permit
- 23-14479-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $132
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 26
- Expires
- Dec 21, 2023
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Issued
Wiring single unit in multi-family dwelling according to plans with 125 amps and 18 circuits
- Permit
- 23-14476-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $132
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 26
- Expires
- Dec 21, 2023
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder In Review
Wiring single unit in multi-family dwelling according to plans with 125 amps and 18 circuits
- Permit
- 23-14475-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $132
- Contractor
- Reinaldo Lopez
- Application submitted
- Application review
-
Permit Electrical Service / Circuit / Feeder Permit Issued
Wiring single unit in multi-family dwelling according to plans with 125 amps and 18 circuits
- Permit
- 23-14474-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $132
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 26
- Expires
- Dec 21, 2023
- Application submitted
- Application review
- Permit approved
- Issue date
-
Permit Electrical Service / Circuit / Feeder Permit Issued
Wiring single unit in multi-family dwelling according to plans with 125 amps and 18 circuits
- Permit
- 23-14473-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $132
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 26
- Expires
- Dec 21, 2023
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Electrical Service / Circuit / Feeder Permit Issued
Wiring single unit in multi-family dwelling according to plans with 125 amps and 18 circuits
- Permit
- 23-14472-SERV
- Type
- Electrical Service / Circuit / Feeder
- Work
- Electrical Service / Circuit / Feeder
- Estimated cost (applicant’s figure)
- $5,000
- Fees
- $132
- Contractor
- Reinaldo Lopez
- Days from application to issue
- 119
- Expires
- Mar 22, 2024
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Dumpster/Construction Zone Other
Extension of existing permit 21-01744-RCZD for 180 days Construction Zone Permit to facilitate construction and material deliveries. The construction area between the curb and the property line will be fenced off to protect the public during construction.
- Permit
- 22-32018-RCZD
- Type
- Dumpster/Construction Zone
- Work
- Dumpster/Construction Zone
- Estimated cost (applicant’s figure)
- $0
- Fees
- $870
- Days from application to issue
- 42
- Expires
- Jun 5, 2023
-
Permit Street Cut Other
saw cutting
- Permit
- 22-09685-RSTC
- Type
- Street Cut
- Work
- Street Cut
- Estimated cost (applicant’s figure)
- $0
- Fees
- $304
- Days from application to issue
- 14
- Expires
- Oct 14, 2022
-
Permit Dumpster/Construction Zone Other
Extension of existing permit 21-01744-RCZD for 180 days Construction Zone Permit to facilitate construction and material deliveries. The construction area between the curb and the property line will be fenced off to protect the public during construction.
- Permit
- 22-08921-RCZD
- Type
- Dumpster/Construction Zone
- Work
- Dumpster/Construction Zone
- Estimated cost (applicant’s figure)
- $0
- Fees
- $500
- Contractor
- Douglas C Mayo
- Days from application to issue
- 35
- Expires
- Oct 28, 2022
-
Permit Mechanical Fuel Gas Permit Finaled
Install gas service for 1 tankless water service, 1 stove
- Permit
- 22-02098-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $3,000
- Fees
- $40
- Days from application to issue
- 4
- Expires
- Jul 24, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Permit Finaled
Install gas service for 1 tankless, 1 stove
- Permit
- 22-02097-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $3,000
- Fees
- $40
- Days from application to issue
- 4
- Expires
- Jul 24, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Permit Finaled
Install gas service for 1 tankless water heater, 1 stove
- Permit
- 22-02096-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $3,000
- Fees
- $40
- Days from application to issue
- 4
- Expires
- Jul 24, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Permit Finaled
Install gas service for 1 tankless water heater, 1 stove
- Permit
- 22-02094-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $3,000
- Fees
- $40
- Days from application to issue
- 4
- Expires
- Jul 24, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Permit Finaled
Install gas service for 1 tankless water heater, 1 stove
- Permit
- 22-02092-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $3,000
- Fees
- $40
- Days from application to issue
- 4
- Expires
- Jul 24, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Permit Finaled
Install gas service for 1 tankless water heater, 1 stove
- Permit
- 22-02090-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $3,000
- Fees
- $40
- Days from application to issue
- 4
- Expires
- Jul 24, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Mechanical Fuel Gas Permit Finaled
Install gas service for 1 bbq pit, 2 gas lights
- Permit
- 22-02089-FGAS
- Type
- Mechanical Fuel Gas
- Work
- Mechanical Fuel Gas
- Estimated cost (applicant’s figure)
- $3,000
- Fees
- $75
- Days from application to issue
- 4
- Expires
- Jul 24, 2022
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Dumpster/Construction Zone Other
Extension of existing permit 21-01744-RCZD for 180 days Construction Zone Permit to facilitate construction and material deliveries. The construction area between the curb and the property line will be fenced off to protect the public during construction.
- Permit
- 21-24612-RCZD
- Type
- Dumpster/Construction Zone
- Work
- Dumpster/Construction Zone
- Estimated cost (applicant’s figure)
- $0
- Fees
- $100
- Days from application to issue
- 61
- Expires
- Apr 21, 2022
-
Permit Construction Loop Permit Finaled
Temporary pole.
- Permit
- 21-09770-LOOP
- Type
- Construction Loop
- Work
- Construction Loop
- Estimated cost (applicant’s figure)
- $300
- Fees
- $40
- Contractor
- Lopez Reinaldo
- Days from application to issue
- 2
- Expires
- Oct 9, 2021
- Application submitted
- Application review
- Permit approved
- Issue date
- First inspection
-
Permit Driveway/ Curb Cut and Restoration Other
Driveway Curb Cut Permit
- Permit
- 21-03454-RDRV
- Type
- Driveway/ Curb Cut and Restoration
- Work
- Driveway/ Curb Cut and Restoration
- Estimated cost (applicant’s figure)
- $0
- Fees
- $100
- Days from application to issue
- 811
- Expires
- Oct 27, 2023
-
Code enforcement Case 21-00313-MPM Closed
The property was inspected on 05/19/2021 with a finding of "No Violation". The file was subsequently closed.
- Inspection: Inspection No Violation
The city links this case to permit 25-11477-ECOA.
-
Permit Dumpster/Construction Zone Other
Construction Zone Permit to facilitate construction and material deliveries. The construction area between the curb and the property line will be fenced off to protect the public during construction.
- Permit
- 21-01744-RCZD
- Type
- Dumpster/Construction Zone
- Work
- Dumpster/Construction Zone
- Estimated cost (applicant’s figure)
- $0
- Fees
- $500
- Days from application to issue
- 5
- Expires
- Jul 25, 2021
-
Permit New Construction Permit Cancelled
new 4 story building with parking on ground floor and 6 living units on the upper 3 floors.
- Permit
- 19-29338-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $1,100,000
- Fees
- $9,990
- Contractor
- Michael Bryan II Kane
- Application submitted
-
Permit Change of Address Permit Issued
6 condos and one HM at 1117 Gov Nicholls St 18-33925-NEWC Retire 1119 Gov Nicholls St Add Units 2A, 2B, 3A, 3B. 4A, 4B, GAR and HM
- Permit
- 18-34917-ECOA
- Type
- Change of Address
- Work
- Change of Address
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 0
- Expires
- May 12, 2019
- Application submitted
- Permit approved
- Issue date
-
Permit HDLC COA Permit Finaled
New construction of a four-story, apartment building.
- Permit
- 18-33925-HDLC
- Type
- HDLC COA
- Work
- HDLC COA
- Estimated cost (applicant’s figure)
- $0
- Fees
- $0
- Days from application to issue
- 649
- Expires
- Jan 22, 2021
Placed here by the building address from “1117 Governor Nicholls St GAR-Unit 4B”.
-
Permit New Construction Other
Construction of a new four story building with 6 living units equalling 7683sqft and 6 parking spaces in a 2149sqft garage as per plans. The parking spaces will be on the ground level and there will be 2 units per floor on the 3 upper levels. Total square footage including units, balconies, and garage to be 10885sq ft. See BZA 072-20
- Permit
- 18-33925-NEWC
- Type
- New Construction
- Work
- New Construction
- Estimated cost (applicant’s figure)
- $1,045,128
- Fees
- $9,504
- Days from application to issue
- 828
- Expires
- Jul 16, 2021
- Application submitted
- Application review
- Zoning review
- Plan review
- Permit approved
- Issue date
- First inspection
Placed here by the building address from “1117 Governor Nicholls St GAR-Unit 4B”.
-
Permit Dumpster/Construction Zone Other
Repair to Cross Arms
- Permit
- 18-09524-RCZD
- Type
- Dumpster/Construction Zone
- Work
- Dumpster/Construction Zone
- Estimated cost (applicant’s figure)
- $0
- Fees
- $60
-
Code enforcement Case 18-00084-MPM Closed
The property was inspected on 01/30/2018 with a finding of "Violation: No WIP". The file was subsequently closed.
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
The city links this case to permit 25-11477-ECOA.
-
Code enforcement Case ENVHADJ-20081757PC Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 25-11477-ECOA.
-
Code enforcement Case ENVHADJ-20081758PC Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 25-11477-ECOA.
-
Code enforcement Case ENVHADJ-20081759PC Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 25-11477-ECOA.
-
Code enforcement Case ENVHADJ-2009961P Closed
A hearing was held on 05/11/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
The city links this case to permit 25-11477-ECOA.