1818 General Pershing Street is in Milan, zoned HU-RD2 (Older neighborhoods, two-family homes mixed with single-family homes). It is in the Uptown historic district under partial HDLC control, where demolition needs HDLC review. The city has 4 permits on record here; the most recent, an accessory structure permit, was filed in March 2014. 3 are still open. There are 2 open code enforcement cases. On this block in the past year: 5 requests to 311 and 4 calls to police.
- Zoning
- HU-RD2
- Historic district
- Uptown (Partial control)
- National Register
- Uptown New Orleans Historic District
- Council district
- B
- Ward
- 12
- Lot size
- 7,781 sq ft
- Parcel
- 41217102
Everything on record here
8 records, newest first · 5 open
-
Code enforcement Case 24-08679-MPM Judgment
A hearing was held on 02/23/2026 with a result of "Guilty".
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Inspection: Inspection Violation: No WIP
- Violation: 157 Sanitation
- Violation: 160 Weeds and Plant Growth
- Violation: 164 Motor Vehicles
- Violation: 167 Exterior Surfaces
- Violation: 167 Paint or Protective Treatment
- Violation: 171 Weatherboards
- Violation: 172 Roofs
- Inspection: Posting of Hearing Notice Violation: No WIP
- Hearing: Initial Hearing Reset: Work In Progress
- Hearing: Reset Hearing Reset: Not Re-Inspected
- Inspection: Reinspection Violation: No WIP
- Hearing: Reset Hearing Guilty
The city links this case to permit 14-09798-ACCS.
-
Code enforcement Case 21-06744-MPM Closed
The property was inspected on 11/16/2021 with a finding of "Violation: No WIP". The file was subsequently closed.
- Violation: 160 Weeds and Plant Growth
- Violation: 161 Rodent Harborage
- Violation: 164 Motor Vehicles
- Violation: 167 Exterior Surfaces
- Violation: 167 Siding and Masonry
- Violation: 168 Premises Identification
- Violation: 169 Structure
- Violation: 171 Weatherboards
- Violation: 172 Gutters and Downspouts
- Violation: 174 Decorative Features
- Inspection: Inspection Violation: No WIP
The city links this case to permit 14-09798-ACCS.
-
Code enforcement Case 17-00323-MPM Judgment
A hearing was held on 11/13/2018 with a result of "Guilty".
- Inspection
- Title Research
- Hearing
- Judgment
- In Compliance
- Inspection: Inspection Violation: No WIP
- Violation: 164 Motor Vehicles
- Violation: 167 Exterior Surfaces
- Violation: 167 Paint or Protective Treatment
- Inspection: Posting of Hearing Notice Violation: No WIP
- Hearing: Initial Hearing Guilty
The city links this case to permit 11MCH-02663.
-
Permit Accessory Structure Occupancy
Demolish part of existing shed and rebuild two exterior walls with fire rated materials(5/8 inch sheetrock) as per sketch. (1818-20 General Pershing St)
- Permit
- 14-09798-ACCS
- Type
- Accessory Structure
- Work
- Accessory Structure
- Estimated cost (applicant’s figure)
- $1,000
- Fees
- $115
- Days from application to issue
- 0
- Expires
- Sep 28, 2014
-
Permit General Mechanical Inspection - Completed
INSTALL GAS LINE AND ENTERGY GAS LEAK. CARL BOURGEOIS (#56221)
- Permit
- 11MCH-02663
- Type
- General Mechanical
- Estimated cost (applicant’s figure)
- $0
- Fees
- $45
- Contractor
- Al Bourgeois Plg&Htg
- Days from application to issue
- 0
-
Code enforcement Case ENVHADJ-20041716EH Closed
A hearing was held on 04/10/2009 with a result of "Found Guilty". The case was subsequently closed.
- Inspection: Inspection Complete
- Hearing: Initial Hearing Found Guilty
-
Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved
REWIRE/MLONE,Q
- Permit
- 07ELC-16567
- Type
- Electrical Service / Circuit / Feeder
- Work
- Service-Circuits-Feeders
- Estimated cost (applicant’s figure)
- $0
- Fees
- $90
- Contractor
- Malone Electrical
- Days from application to issue
- 10
-
Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved
reconnect
- Permit
- 05ELC-09880
- Type
- Electrical Repair / Replacement / Addition
- Work
- Repair-Replacement-Addition
- Estimated cost (applicant’s figure)
- $0
- Fees
- $30
- Contractor
- L.P.C.Electric Ser
- Days from application to issue
- 10