Central City

1130 Oretha Castle Haley Boulevard is in Central City, zoned MU-2 (High-intensity mixed use, walkable centers with homes, offices and shops). The city has 32 permits on record here; the most recent, a mechanical HVAC permit, was filed in December 2020. 17 are still open. A demolition permit was filed in March 2016. On this block in the past year: 2 requests to 311 and 171 calls to police.

Zoning
MU-2
Historic district
None
National Register
Central City Historic District
Council district
B
Ward
2
Lot size
32,692 sq ft
Parcel
41221460

Everything on record here

32 records, newest first · 17 open

  1. Permit Mechanical HVAC Permit Finaled

    Install 5 Ton HVAC System with Electric heat for phase 3 of 3 renovations.

    Permit
    20-49195-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $41,000
    Fees
    $71
    Contractor
    Robert Wolfe Construction Inc
    Days from application to issue
    3
    Expires
    Jun 14, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  2. Permit Electrical Repair / Replacement / Addition Permit Issued

    Install new panel 100 amp, 10 circuits for 1st and 2nd floor renovations.

    Permit
    20-49191-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $37,000
    Fees
    $100
    Contractor
    Paul E. Herkes IV
    Days from application to issue
    3
    Expires
    Jun 14, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  3. Permit Electrical Service / Circuit / Feeder Permit Finaled

    Installed 400amp service and connected portable buildings.

    Permit
    20-33890-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $5,000
    Fees
    $175
    Contractor
    Nicholas Nuccio
    Days from application to issue
    8
    Expires
    Jan 16, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  4. Permit Mechanical HVAC Permit Finaled

    (4) 2 TON CONDENSERS ON MODULAR BUILDING

    Permit
    20-32637-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $500
    Fees
    $90
    Days from application to issue
    5
    Expires
    Jan 1, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  5. Permit Mechanical HVAC Permit Issued

    NATALS AIR CONDITIONING FRANK D NATAL JR INSTALL (4) 2 TON CONDENSERS STRAIGHT COOL.

    Permit
    20-32239-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $500
    Fees
    $90
    Days from application to issue
    164
    Expires
    Jun 4, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  6. Permit Renovation (Non-Structural) Occupancy

    Interior reconfigurations and renovations of existing spaces within an existing historic building (Phase 3 of 3 phases)

    Permit
    20-30541-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $415,192
    Fees
    $2,556
    Contractor
    Robert Wolfe Construction Inc
    Days from application to issue
    97
    Expires
    Mar 10, 2021
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  7. Permit Change of Address Permit Issued

    Adding addresses for modular building and utilities 18-08824-NEWC ADD 1825 Clio St ADD 1825 Clio St HM

    Permit
    20-30200-ECOA
    Type
    Change of Address
    Work
    Change of Address
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Dec 3, 2020
    1. Application submitted
    2. Permit approved
    3. Issue date

    See this permit on One Stop

    Placed here by the building address from “1825 Clio St -HM”.

  8. Permit New Construction Permit Issued

    Install 3470 sq ft modular building on the site of existing Emergency Shelter as per plans.

    Permit
    18-08824-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $200,000
    Fees
    $1,325
    Contractor
    Robert Wolfe Commercial Construction LLC, Kyle Associates
    Days from application to issue
    160
    Expires
    Feb 28, 2019
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

    Placed here by the building address from “1825 Clio St -HM”.

  9. Permit Moving Equipment Permit Issued

    Install 1 new elevator

    Permit
    18-07991-MOVG
    Type
    Moving Equipment
    Work
    Moving Equipment
    Estimated cost (applicant’s figure)
    $0
    Fees
    $125
    Contractor
    Otis Elevator
    Days from application to issue
    0
    Expires
    Sep 8, 2018
    1. Application submitted
    2. Permit approved
    3. Issue date

    See this permit on One Stop

  10. Permit Mechanical HVAC Permit Finaled

    Install 5 Ten Ton Package Units

    Permit
    17-43364-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $10,000
    Fees
    $335
    Days from application to issue
    2
    Expires
    Jun 29, 2018

    See this permit on One Stop

  11. Permit Electrical Repair / Replacement / Addition Permit Finaled

    Relocate existing service. Need a cut out / cut in. Keeping same amperage and not adding any circuits

    Permit
    17-27905-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $2,000
    Fees
    $40
    Days from application to issue
    1
    Expires
    Feb 15, 2018

    See this permit on One Stop

  12. Permit Electrical Repair / Replacement / Addition Permit Issued

    correct wiring for the renovation of the New Orleans Mission and supply circuits for the new addition

    Permit
    17-16039-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $500,000
    Fees
    $595
    Days from application to issue
    14
    Expires
    Nov 22, 2017

    See this permit on One Stop

  13. Permit Construction Loop Permit Finaled

    Temporary Pole

    Permit
    17-15925-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $475,000
    Fees
    $40
    Days from application to issue
    0
    Expires
    Nov 8, 2017

    See this permit on One Stop

  14. Permit Electrical Repair / Replacement / Addition Other

    Had to repair temporary pole located at the New Orleans Mission

    Permit
    17-15185-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $250
    Fees
    $40

    See this permit on One Stop

  15. Permit Demolition Other

    NCDAC FEBRUARY 15, 2016 - Demolition to grade of vacant commercial rear building only. All debris to be removed within 72 hours. any further use of this property shall requiree a separate permit. Motion M-16-74

    Permit
    16-01121-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $50,000
    Fees
    $845
    Contractor
    Robert Wolfe Commercial Construction LLC
    Days from application to issue
    55
    Expires
    Sep 7, 2016

    See this permit on One Stop

  16. Permit Electrical Repair / Replacement / Addition Permit Issued

    adding lights 15-00383-RNVS

    Permit
    15-34413-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $49
    Contractor
    Shawn C Bradley
    Days from application to issue
    0
    Expires
    May 13, 2016

    See this permit on One Stop

  17. Permit Renovation (Structural) Occupancy

    Construct 7,500 SF addition to residential care center; also, renovate interior as per plans. Permit is extended for 6 months to 11/17/2017 Permit is extended for 6 months to 5/17/2018.

    Permit
    15-33277-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $3,897,748
    Fees
    $23,578
    Contractor
    Ronald Blitch, Robert Wolfe Commercial Construction LLC
    Days from application to issue
    163
    Expires
    Oct 15, 2016

    See this permit on One Stop

  18. Permit Renovation (Structural) Permit Issued

    Renovation and restoration of primary building facades and main roof areas; one interior stair renovation. All work as per plans.

    Permit
    15-00383-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $1,000,000
    Fees
    $5,060
    Contractor
    Ronald Blitch, Robert Wolfe Construction Inc
    Days from application to issue
    103
    Expires
    Nov 5, 2015

    See this permit on One Stop

  19. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    TEMPORARY LIGHTING FOR HOMELESS SHELTER

    Permit
    08ELC-05329
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $48
    Contractor
    Sl Contracator
    Days from application to issue
    10
  20. Permit General Mechanical Application Acceptance - Approved

    INSTALL TWO 5-TON A\C UNIT AND ELEC WAF. JAVIER PENA (#1254)

    Permit
    08MCH-01164
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $86
    Contractor
    Totnic A/C & Heating LLC
    Days from application to issue
    5
  21. Permit Construction Loop Application Acceptance - Approved

    TEMP POLE

    Permit
    07ELC-35175
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Sl Contracator
    Days from application to issue
    10

    Placed here by a known alternate street name from “1823 Clio”.

  22. Permit Mechanical Permit Issuance Active

    rll-l-domino-400-0746-1-hood-1-gas-line-1-se-ck-2957-2934

    Permit
    07MCH-19805
    Type
    Mechanical
    Work
    Hoods
    Estimated cost (applicant’s figure)
    $0
    Fees
    $95
  23. Permit Film Master Application Acceptance - Approved No Review

    40'X 80' TENT TO BE USE FOR A TENT GOSPEL REVIVAL PER SKETCH AND FIRE DEPT. APPROVAL

    Permit
    07SPE-00153
    Type
    Film Master
    Work
    NA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $150
    Days from application to issue
    5

    Placed here by its tax bill number from “1130 Oretha C Haley”.

  24. Permit General Mechanical Meter Release - Released

    l.j.c. ogden guillory tele. 733 2936 ck.33885,4-a.c. cond. units,1-range hood,

    Permit
    07MCH-04767
    Type
    General Mechanical
    Work
    General Mechanical
    Estimated cost (applicant’s figure)
    $0
    Fees
    $108
    Contractor
    Guillory Sheet Metal
    Days from application to issue
    5
  25. Permit Electrical Service / Circuit / Feeder Application Acceptance - Approved

    NEW CONSTRUCTION

    Permit
    07ELC-07497
    Type
    Electrical Service / Circuit / Feeder
    Work
    Service-Circuits-Feeders
    Estimated cost (applicant’s figure)
    $0
    Fees
    $270
    Contractor
    All Star Electric,Inc.
    Days from application to issue
    10
  26. Permit Construction Loop Application Acceptance - Approved

    CONST LOOP

    Permit
    06ELC-31441
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    All Star Electric,Inc.
    Days from application to issue
    10
  27. Permit New Construction Certificate of Occupancy - Issued No Meter

    NEW CONSTRUCTION OF A WOMEN'S HOMELESS SHELTER PER PLANS AND ORD 19285. FEES WERE PAID UNDER VOIDED PERMIT 06COM-00458.

    Permit
    06COM-01198
    Type
    New Construction
    Work
    NA
    Estimated cost (applicant’s figure)
    $508,000
    Fees
    $3,098
    Days from application to issue
    28
  28. Permit Construction Loop Application Acceptance - Approved

    temp pole

    Permit
    05ELC-03267
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $0
    Fees
    $30
    Contractor
    Schiro's Elec.Sev.
    Days from application to issue
    10
  29. Permit Demolition PublicWorks Approval - Not Required

    Demolition of the rear portion of a 2 story homeless shelter,(892s.f.) of per owner's request.Inside of the HCDRC District. Plans to follow.

    Permit
    05COM-00283
    Type
    Demolition
    Work
    NA
    Estimated cost (applicant’s figure)
    $5,000
    Fees
    $100
    Days from application to issue
    7
  30. Permit Electrical Repair / Replacement / Addition Application Acceptance - Approved

    FIRE RECONNECT

    Permit
    05ELC-00755
    Type
    Electrical Repair / Replacement / Addition
    Work
    Repair-Replacement-Addition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $150
    Contractor
    Carr's Electric
    Days from application to issue
    10

    Placed here by its tax bill number from “1130 Oretha C Haley”.

  31. Permit Electrical

    CIRCUITS ONLY HOME(AGED,INFIRM,INDIGENT) JESSE CARR

    Permit
    E01003334
    Type
    Electrical
    Days from application to issue
    0

    Placed here by a close spelling of the street from “1130 ORETHA CASTLE HALEY BL”.

  32. Permit Mechanical

    INSTALL MECHANICAL EQUIPMENT GUESTHOUSE INSTALLATION OF NEW GAS LINE AND THREE GAS BOILERS AT 750,000 BTU. EACH. 2,500,000 BTU. DANNY 866-7162.

    Permit
    M01000600
    Type
    Mechanical
    Days from application to issue
    0

    Placed here by a close spelling of the street from “1130 ORETHA CASTLE HALEY BL”.