Audubon

1 Newcomb Place is in Audubon, zoned EC (University campuses). The city has 877 permits on record here; the most recent, an electrical service / circuit / feeder permit, was filed in November 2026. 304 are still open. A demolition permit was filed in May 2023. There were 4 past code enforcement cases, the latest in April 2009, all closed.

Zoning
EC
Historic district
None
Council district
A
Ward
14
Lot size
3,487,596 sq ft
Parcel
41222765

Everything on record here

207 records, newest first · 69 open

Showing the latest 200 of 877 permits.

  1. Permit Electrical Service / Circuit / Feeder Permit Issued

    Install fixtures switches and receptacles.

    Permit
    26-33766-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $29,732
    Fees
    $85
    Contractor
    Alfred Clinton Deubler, III
    Days from application to issue
    2
    Expires
    May 18, 2027
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  2. Permit Mechanical HVAC In Review

    Interior Renovation for Science Lab

    Permit
    26-33777-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $69,431
    Fees
    $760
    Contractor
    Douglas Anthony Guthans
    Days from application to issue
    3
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  3. City record Electrical Service / Circuit / Feeder Application Submitted

    Install fixtures switches and receptacles.

    1. Application Submitted
    2. Electrical review Pending

    See this record on One Stop · checked Nov 16, 2026

  4. City record Mechanical HVAC Application Submitted

    Interior Renovation for Science Lab

    1. Application Submitted
    2. Mechanical Permit Review review Pending

    See this record on One Stop · checked Nov 16, 2026

  5. Permit Streetlight Banner Application Accepted

    Banners would highlight the New Orleans Book Festival at Tulane University. The banners promote the dates of the event, which are March 11-14, 2027 and we wanted to get them up to market during Mardi Gras, because our "theme" is "Mardi Gras for the Mind".

    Permit
    26-31970-SLBN
    Type
    Streetlight Banner
    Work
    Streetlight Banner
    Estimated cost (applicant’s figure)
    $0
    Fees
    $350
    Contractor
    Uptown Graphics Inc
    1. Temporary Banner Unpaid
    2. Application Submitted Complete
    3. Public Works - Traffic Pending

    See this permit on One Stop

  6. Permit Moving Equipment Permit Issued

    Full Modernization of One (1) Hydraulic Elevator

    Permit
    26-31137-MOVG
    Type
    Moving Equipment
    Work
    Moving Equipment
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,205
    Contractor
    Otis Elevator
    Days from application to issue
    0
    Expires
    Apr 21, 2027
    1. Mechanical Alterations Paid
    2. Mechanical Alterations Paid
    3. Mechanical Alterations Paid
    4. Escalator
    5. Application Submitted Complete
    6. Application Review Complete
    7. Permit Approved Complete
    8. Permit Issued Complete
    9. Application submitted
    10. Application review
    11. Permit approved
    12. Issue date

    See this permit on One Stop

  7. Permit Electrical Service / Circuit / Feeder Other

    New circuits for mini-split HVAC units.

    Permit
    26-23591-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $6,700
    Fees
    $52
    Contractor
    Jared Lemoine
    Days from application to issue
    2
    Expires
    Feb 13, 2027
    1. Electrical Paid
    2. Rough Electrical
    3. UG Electrical
    4. Application Submitted Complete
    5. Application submitted
    6. Application Review Complete
    7. Permit Approved Complete
    8. Permit Issued Complete
    9. Electrical Complete
    10. Application review
    11. Permit approved
    12. Issue date
    13. Final Electric Passed
    14. First inspection
    15. Certificate of Completion Complete
    16. Meter Release Complete

    See this permit on One Stop

  8. Permit Renovation (Non-Structural) Permit Issued

    NEW 1,280 SF INTERIOR RENOVATION FOR A SCIENCE LAB BUILD OUT TO AN EXISTING UNFINISHED SPACE IN FLOWER HALL ROOM 301. THE BUILD OUT CONSISTS OF ARCHITECTURAL, MECHANICAL, ELECTRICAL AND SPRINKLER WORK. TWO NEW OFFICES WILL BE ADDED TO THE SPACE AS WELL AS A LARGE AREA WITH WORK STATIONS. ALL WORK TO BE DONE AS PER PLANS.

    Permit
    26-22454-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $195,297
    Fees
    $1,296
    Days from application to issue
    109
    Expires
    May 16, 2027
    1. Building Permit - Application Filing Fee Paid
    2. Building Unpaid
    3. Building Plan Review Unpaid
    4. Commercial Final C/O Documents
    5. Commercial Final C/O Inspection
    6. Rough Framing
    7. Application Submitted Complete
    8. Application submitted
    9. Permit Intake Revisions Needed
    10. Zoning Complete
    11. Electrical Plan Review Complete
    12. Mechanical Plan Review Complete
    13. Plan Review Revisions Needed
    14. Application review
    15. Zoning review
    16. Plan review
    17. Permit approved
    18. Issue date

    See this permit on One Stop

  9. Permit Mechanical HVAC Permit Issued

    Permit for installating two 2-ton mini split units.

    Permit
    26-22294-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $29,000
    Fees
    $100
    Contractor
    C & D Plumbing & Mechanical, LLC.
    Days from application to issue
    1
    Expires
    Jan 30, 2027
    1. Air Conditioning Paid
    2. Mechanical Paid
    3. Warm Air Furnaces Paid
    4. Duct Leakage
    5. Warm Air Furnace
    6. Whole House Infiltration
    7. Air Conditioning
    8. Application Submitted Complete
    9. Application submitted
    10. Application Review Complete
    11. Permit Approved Complete
    12. Permit Issued Complete
    13. Mechanical Permit Review Complete
    14. Application review
    15. Permit approved
    16. Issue date
    17. Rough Mech HVAC Comm Passed
    18. First inspection

    See this permit on One Stop

  10. Permit Electrical Service / Circuit / Feeder Permit Issued

    Installation of new lighting circuit and general-purpose receptacle circuit. 1 new circuit and 100 amps

    Permit
    26-21762-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $54,450
    Fees
    $73
    Contractor
    Jared Lemoine
    Days from application to issue
    4
    Expires
    Jan 28, 2027
    1. Electrical Paid
    2. Final Electric
    3. Rough Electrical
    4. UG Electrical
    5. Application Submitted Complete
    6. Application submitted
    7. Application Review Complete
    8. Permit Approved Complete
    9. Electrical Complete
    10. Application review
    11. Permit approved
    12. Permit Issued Complete
    13. Issue date

    See this permit on One Stop

  11. Permit Renovation (Non-Structural) Permit Issued

    Wilson Althletic Center - Installation of mini-split condensing system in AV closet and Electrical closet. Installation of associated electrical gear, conduit and conductors required for mini-split condensing system.

    Permit
    26-18300-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $62,022
    Fees
    $438
    Contractor
    Pangea Construction LLC
    Days from application to issue
    41
    Expires
    Jan 29, 2027
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  12. Permit Electrical Service / Circuit / Feeder Other

    meter release for new 200 amp electrical service at yulman stadium. Meter Release: 2900 Ben Weiner Dr

    Permit
    26-16898-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $20,698
    Fees
    $103
    Contractor
    Mason Allan Matherne
    Days from application to issue
    10
    Expires
    Dec 15, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  13. Permit Renovation (Non-Structural) Permit Issued

    Interior Build-out of current whitebox space within Fogelman Dormitory Hall located on Tulane Univirsity Campus. The work includes replacing of current wall, ceiling and floor finishes; adding of new ceiling baffles and new custom millwork reading niches. Minor interior demolition and minor modifications to existing sprinkler heads.

    Permit
    26-16882-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $409,537
    Fees
    $2,520
    Contractor
    Boudreaux Nathan Builders, Inc.
    Days from application to issue
    49
    Expires
    Jan 24, 2027
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  14. Permit Mechanical Fuel Gas Permit Issued

    Running natural gas lines to two hoods in a lab. Hoods filed on HVAC

    Permit
    26-16592-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $19,998
    Fees
    $15
    Contractor
    C & D Plumbing & Mechanical, LLC.
    Days from application to issue
    0
    Expires
    Dec 3, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  15. Permit Mechanical HVAC Permit Issued

    Installation of a new Outdoor Air Unit for a lab. Air unit will have new supply air serving the room. Installation of lab exhaust fan.

    Permit
    26-16590-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $200,000
    Fees
    $184
    Contractor
    C & D Plumbing & Mechanical, LLC.
    Days from application to issue
    0
    Expires
    Dec 3, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  16. Permit Plumbing Permit Permit Issued

    Installation of acid waste piping serving 2 laboratory sinks.

    Permit
    26-16484-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $200
    Contractor
    Christopher Michael Naquin
    Days from application to issue
    3
    Expires
    Dec 5, 2026

    See this permit on One Stop

  17. Permit Electrical Service / Circuit / Feeder Permit Issued

    New circuit installation

    Permit
    26-12521-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $108,730
    Fees
    $100
    Days from application to issue
    17
    Expires
    Nov 11, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  18. Permit Mechanical HVAC Application Accepted

    Mechanical permit for duct modifications and exhaust fan install 6823 Saint Charles Ave, 627 Lindy Boggs Center.

    Permit
    25-38660-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $76,582
    Fees
    $30
    Contractor
    Christopher Michael Naquin
    1. Application submitted

    See this permit on One Stop

  19. Permit Renovation (Non-Structural) Other

    Replacement of existing roll down fire shutters at a community stair in Fogelman Dormitory Hall located on Tulane University Campus. The shutters will be replaced at floors 3, 5, and 7 with rated double magnetic hold open doors. The doors will be connected to the existing fire alarm system. The stairs are not egress stairs and there will be no change to life safety. To be built as per plans.

    Permit
    26-11598-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $58,455
    Fees
    $415
    Contractor
    Jos R Labadot Inc
    Days from application to issue
    62
    Expires
    Dec 17, 2026
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  20. Permit Permit Finaled

    Crawfest 2026 - 31 McAlister Dr - 4-18-2026 Administrators of the Tulane University Educational Fund non-profit event charging admission, Outside vednors vending food, drinks, and merchandise. Live entertainment sound amplification outdoors. (15) Tents. (1) Stage. Cooking Onsite with NOFD Fire Watch. Portolets. Crawfest 2026 on 4/18/26. On the campus of Tulane University featuring live music and on site cooking. 11:00 am - 5:00 pm

    Permit
    26-09949-SPMA
    Days from application to issue
    14
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
  21. Permit Renovation (Non-Structural) Permit Issued

    RENOVATION OF THE FIRST FLOOR OF AN EXISTING UNIVERSITY BUILDING USED FOR INTAKE AND SORTING OF REFERENCE MATERIALS. WORK IS LIMITED TO THE FIRST FLOOR. WORK IS TO BE LESS THE 50% OF THE BUILDING FOOTPRINT AND BUILDING VALUE.

    Permit
    26-08758-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $47,872
    Fees
    $420
    Contractor
    Studio Rise LLC
    Days from application to issue
    120
    Expires
    Jan 22, 2027
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  22. Permit Electrical Service / Circuit / Feeder Other

    Flower Hall Building at Tulane University. Add new 100 amp feeder, connected to exisitng electrical service. Install new transformer and circuit breaker panel. Connect new labratory equipment. No meter required.

    Permit
    26-06394-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $38,042
    Fees
    $46
    Contractor
    Frederick Andrew Schenck Sr.
    Days from application to issue
    21
    Expires
    Sep 25, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  23. Permit Mechanical HVAC Other

    Installing new HVAC unit, ductwork and piping.

    Permit
    26-03070-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $64,600
    Fees
    $65
    Days from application to issue
    14
    Expires
    Aug 18, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  24. Permit Renovation (Structural) Application Accepted

    Please note that the project is located at 2015 Percival Stern Hall, Tulane University, 6400 Freret St. The project is a renovation of existing storage room to partially become a chemical storage room with adjacent office. the chemical storage room will have strict and limited access by card reader and approved personnel only. The renovation will be 514 square feet total and will be on the first floor of the building.

    Permit
    26-03095-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $550,000
    Fees
    $6,170
    Contractor
    Andrea Bowman, Keith Clement
    1. Application submitted

    See this permit on One Stop

  25. Permit Renovation (Non-Structural) Permit Issued

    Burying conduit and fiber optic cable along existing path. Cable and fiber are currently installed above grade.

    Permit
    25-37540-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $42,598
    Fees
    $335
    Contractor
    ADB Companies
    Days from application to issue
    86
    Expires
    Oct 17, 2026
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  26. Permit Renovation (Non-Structural) Permit Issued

    Install conduit from Entergy utility pole under access road to new meter location on the western side of Yulman Stadium.

    Permit
    25-31617-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $20,702
    Fees
    $225
    Contractor
    B3 Wireless & Construction LLC
    Days from application to issue
    125
    Expires
    Nov 26, 2026
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  27. Permit Streetlight Banner Application Accepted

    These banners would be used to market the New Orleans Book Festival at Tulane University. They will have the date on some and the name and tagline on others.

    Permit
    26-00204-SLBN
    Type
    Streetlight Banner
    Work
    Streetlight Banner
    Estimated cost (applicant’s figure)
    $0
    Fees
    $500
    Contractor
    Uptown Graphics Inc

    See this permit on One Stop

  28. Permit Electrical Service / Circuit / Feeder Other

    Install fixtures and receptacles

    Permit
    25-36931-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $1,925
    Fees
    $64
    Contractor
    ALFRED Clinton DEUBLER, III
    Days from application to issue
    7
    Expires
    Jun 5, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  29. Permit Renovation (Non-Structural) Permit Issued

    Interior buildout of an existing laboratory space in Room 104. New lab equipment, temporary wall construction at entry door, and new electrical panel.

    Permit
    25-35853-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $150,000
    Fees
    $960
    Contractor
    Scott Mouledous Construction Inc
    Days from application to issue
    50
    Expires
    Jul 6, 2026
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  30. Permit Plumbing Permit Other

    Plumbing permit for Tulane Boggs Lab 633 at 6823 Saint Charles Ave.

    Permit
    25-35350-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $50
    Contractor
    Christopher Michael Naquin
    Days from application to issue
    8
    Expires
    May 19, 2026

    See this permit on One Stop

  31. Permit Renovation (Non-Structural) Permit Issued

    Interior build-out of an existing laboratory space on Tulane's campus within Stern Hall, 5th floor. Rooms 5019 and 5025. Scope of work includes new interior partition walls, cabinetry, mechanical and electrical upgrades.

    Permit
    25-35267-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $708,886
    Fees
    $4,314
    Contractor
    MULLINS BROS CONSTRUCTION,INC
    Days from application to issue
    163
    Expires
    Oct 23, 2026
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  32. Permit Electrical Service / Circuit / Feeder Permit Finaled

    Electrical renovation of laboratory and equipment.

    Permit
    25-34546-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $87,985
    Fees
    $121
    Days from application to issue
    14
    Expires
    May 18, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  33. Permit Electrical Service / Circuit / Feeder Other

    Electrical renovation for new lab equipment.

    Permit
    25-33537-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $87,985
    Fees
    $121
    1. Application submitted

    See this permit on One Stop

  34. Permit Renovation (Non-Structural) Permit Issued

    Retrofit office area into closed office room.

    Permit
    25-32382-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $26,667
    Fees
    $0
    Contractor
    MULLINS BROS CONSTRUCTION,INC
    Days from application to issue
    37
    Expires
    May 21, 2026
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  35. Permit Electrical Service / Circuit / Feeder Other

    Installation of Electrical Service at Newcomb Hall Exceeding the scope of the permit or failure to obtain the proper building permits will result in additional fees as well as delays in issuance of a certificate of occupancy, meter release, and any other remedy allowed by law. Such remedies include but are not limited to revocation of all permits for the property.

    Permit
    25-30189-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $1,822,850
    Fees
    $1,450
    Contractor
    A1 Electrical Contractors
    Days from application to issue
    20
    Expires
    Apr 21, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  36. Permit Attached Sign Permit Issued

    Signage permit application for Tulane University football practice facility. 1 roof top sign 1 attached wall sign

    Permit
    25-28737-SATT
    Type
    Attached Sign
    Work
    Attached Sign
    Estimated cost (applicant’s figure)
    $0
    Fees
    $350
    Contractor
    CM Combs Construction, LLC, Studio Rise LLC
    Days from application to issue
    417
    Expires
    May 13, 2027
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  37. Permit Electrical Service / Circuit / Feeder Other

    New construction of an indoor practice facility for Tulane University

    Permit
    25-27322-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $667,000
    Fees
    $560
    Contractor
    CM Combs Construction
    Days from application to issue
    150
    Expires
    Aug 6, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  38. Permit Mechanical HVAC Other

    Install 1 new energy recovery ventilator on a dedicated outdoor air unit.

    Permit
    25-26049-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $75,000
    Fees
    $65
    Contractor
    Andrew Barber
    Days from application to issue
    28
    Expires
    Mar 23, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  39. Permit Mechanical Fuel Gas Application Accepted

    New 3/4" Gas line underground directional bore for the Temporary Indoor Practice Facility. The gas line serves the new backup generator onsite.

    Permit
    25-25847-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $6,314
    Fees
    $74
    Contractor
    Andrew Barber
    1. Application submitted

    See this permit on One Stop

  40. Permit Mechanical HVAC Other

    We are hooking up three (3) units to facility temporary indoor practice facility. The three (3) units are self-contained, two of the units are 105 ton Trane RTU/AHU units and the other is a blower fan unit containing two fans for pressurization and back up air fan. Additionally, we have one (1) mini split located in the field house IT room with the outdoor condenser and wall hung indoor evaporator.

    Permit
    25-25829-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $29,886
    Fees
    $421
    Contractor
    Andrew Barber
    Days from application to issue
    2
    Expires
    Feb 27, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  41. Permit Permit Finaled

    Tulane Football Tailgating Tulane Tailgate Village 2025 (1) - Berger Family Lawn (Tulane University) 8/30/2025 Tulane’s Pep Rally, tailgating activities. Free public event. Food sales (cooking on site). Live entertainment, sound amplification outdoors. Various Tents: 40x80, 20x20,10x10, 30x30. (1) SL 100 Stage. Portolets. Alcohol Sales by Sodexo per catering license only. EMS with Acadian Ambulance. 1,000 Attendees. 8 AM - 8 PM Route: McAlister Place (near Berger Family Lawn) across Willow to Janet Yulman and into the Stadium. Formation: TBA AM Start: TBA AM End: TBA PM 5000 Guests

    Permit
    25-24149-SPMA
    Days from application to issue
    62
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
  42. Permit Electrical Repair / Replacement / Addition Other

    Installation of a new 60 amp/3phase circuit from an existing panel to a new ERV unit on the roof.

    Permit
    25-23662-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $17,418
    Fees
    $61
    Days from application to issue
    23
    Expires
    Feb 28, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  43. Permit Dumpster/Construction Zone Application Accepted

    Tulane University is requesting that the 6800 block of Freret St be blocked off for bus usage from August 6th to August 27th. We need to ensure that campus move in has adequate lane access and cars are not parked in the no parking zone. We need both side of Freret from roughly Engineering Rd to Audubon Pl

    Permit
    25-23444-RCZD
    Type
    Dumpster/Construction Zone
    Work
    Dumpster/Construction Zone
    Estimated cost (applicant’s figure)
    $0
    Fees
    $100

    See this permit on One Stop

  44. Permit Permit Permit not required

    ***PERMIT NOT NEEDED - REFERRED TO NOFD*** We will be shooting Pyrotechnics for the player introductions for Tulane football.

    Permit
    25-23049-SPMA
    1. Application submitted
  45. Permit Electrical Service / Circuit / Feeder Other

    200A SERVICE FOR AT&T'S EQUIPMENT

    Permit
    25-22092-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $16,000
    Fees
    $109
    Contractor
    Wesley Harold Brown Jr.
    Days from application to issue
    5
    Expires
    Jan 28, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  46. Permit Change of Address Other

    -90.116999, 29.945235 Antenna, new metered service ADD 2940 Ben Weiner Dr New Orleans, LA 70118

    Permit
    25-22077-ECOA
    Type
    Change of Address
    Work
    Change of Address
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Jan 22, 2026
    1. Application submitted
    2. Permit approved
    3. Issue date

    See this permit on One Stop

  47. Permit Plumbing Permit Other

    The project is a 2,300 square foot fit out of an existing shell space within Paul Hall on Tulane’s uptown campus. The fit out is a clean room space with a 3 bay and chase system of clean room construction with ISO certification levels of 5 and 6. The bays include tools for metrology, etching and electro beam lithography.

    Permit
    25-20767-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $130
    Contractor
    Kenneth E Gootee
    Days from application to issue
    23
    Expires
    Feb 1, 2026

    See this permit on One Stop

  48. Permit Mechanical HVAC Other

    The project is a 2,300 square foot fit out of an existing shell space within Paul Hall on Tulane’s uptown campus. The fit out is a clean room space with a 3 bay and chase system of clean room construction with ISO certification levels of 5 and 6. The bays include tools for metrology, etching and electro beam lithography.

    Permit
    25-20754-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $1,530,000
    Fees
    $260
    Contractor
    Kenneth E Gootee
    Days from application to issue
    23
    Expires
    Feb 1, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  49. Permit Electrical Repair / Replacement / Addition Other

    Construction of the Electrical system associated with the construction of the clean rooms in Paul Hall at Tulane,

    Permit
    25-20245-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $367,053
    Fees
    $310
    Days from application to issue
    43
    Expires
    Feb 19, 2026
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  50. Permit Renovation (Non-Structural) Permit Issued

    Lab 633. Replacement of equipment serving lab space.

    Permit
    25-17923-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $210,247
    Fees
    $1,326
    Contractor
    Pangea Construction LLC
    Days from application to issue
    133
    Expires
    Apr 23, 2026
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  51. Permit Renovation (Non-Structural) Permit Issued

    Modifications to west seating bowl at Yulman Stadium. New premium seating area with a net reduction in overall seats.

    Permit
    25-15226-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $43,815
    Fees
    $340
    Contractor
    Mullins Brothers Constructions
    Days from application to issue
    25
    Expires
    Dec 12, 2025
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  52. Permit Permit Finaled

    Tulane Graduation Parade Date: Saturday May 17th Start Location: Audubon Park (6500 St. Charles Avenue) End Location: The Boot (1039 Broadway St.) Formation: 11:30am/11:45am Step Off: 12:00pm End: 12:30pm Guest Count: 60

    Permit
    25-12233-SPMA
    Days from application to issue
    113
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
  53. Permit Permit Finaled

    Student run music festival on Tulane University's Uptown campus with crawfish and 6 live bands from 11am-5pm on April 5th 2025 Tulane Crawfest 2025 - Berger Family Lawn (Tulane University) 4/5/2025 Tulane University's Student Affairs non-profit event. Non-student general admission. For-profit food & merchandise vendors. Cooking on site. Live entertainment, sound amplification outdoors. Various Tents: (2) 40x80, (7) 10x20, (6) 10x10, (1) 15x60, (1) 10x30. (2) SL 100 Stages. Portolets. Alcohol Sales by Sodexo per catering license only. 15,000 Attendees. 11am-5pm

    Permit
    25-10200-SPMA
    Days from application to issue
    12
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
  54. Permit Renovation (Non-Structural) Other

    The project is a 2,300 square foot fit out of an existing shell space within Paul Hall on Tulane's uptown campus. The fit out is a clean room space with a 3 bay and chase system of clean room construction with ISO certification levels of 5 and 6. The bays include tools for metrology, etching and electro beam lithography.

    Permit
    24-28485-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $5,326,000
    Fees
    $32,016
    Contractor
    Broadmoor, LLC
    Days from application to issue
    106
    Expires
    Jan 2, 2026
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  55. Permit Electrical Repair / Replacement / Addition Permit Cancelled

    A change order to the original permit # 24-09903-SERV. Installing power to a roof top unit energy recovery ventilator HVAC unit.

    Permit
    25-07622-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $17,418
    Fees
    $43
    Contractor
    Pangea Construction LLC
    1. Application submitted
    2. Application review

    See this permit on One Stop

  56. Permit New Construction Occupancy

    TEMPORARY Indoor Practice Facility for University Sports programs. Building is a pre-engineered inflatable structure that will be deflated during tropical weather events and at other periodic times. *UPON C/O ISSUANCE THE C/O MUST BE RENEWED EVERY 180 DAYS FOR A MAXIMUM OF 2 RENEWALS OR PENDING AN IMP AMENDMENT UNDER REVIEW BY THE CITY PLANNING COMMISSION* TCO ISSUED 8-11-2026 FOR 180 DAYS. THIS IS THE FIRST RENEWAL OF THE TCO WITH A MAX OF 2

    Permit
    25-02853-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $3,300,000
    Fees
    $19,860
    Contractor
    CM Combs Construction
    Days from application to issue
    69
    Expires
    Oct 7, 2025
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  57. Permit Street Cut Permit Issued

    Drainage Tie in for New Drainage Project on Engineer Road and Freret St on Tulane's Campus.

    Permit
    24-36757-RSTC
    Type
    Street Cut
    Work
    Street Cut
    Estimated cost (applicant’s figure)
    $0
    Fees
    $328
    Contractor
    Durr Heavy Construction, LLC
    Days from application to issue
    4
    Expires
    Jun 10, 2025

    See this permit on One Stop

  58. Permit Hoods Other

    Installation of Commercial kitchen hood and fire system

    Permit
    24-33635-HOOD
    Type
    Hoods
    Work
    Hoods
    Estimated cost (applicant’s figure)
    $0
    Fees
    $65
    Contractor
    Bourgeois Mace
    Days from application to issue
    22
    Expires
    May 26, 2025
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  59. Permit Renovation (Non-Structural) Other

    Installation of a roof mounted energy recovery ventilator HVAC unit with ductwork. All work to be done as per plans.

    Permit
    24-31009-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $739,972
    Fees
    $4,500
    Contractor
    Pangea Construction LLC
    Days from application to issue
    41
    Expires
    Jun 2, 2025
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  60. Permit Renovation (Non-Structural) Permit Cancelled

    Installation of walk in cooler

    Permit
    24-32167-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $11,878
    Fees
    $180
    Contractor
    Affordable Refridgeration, LLC
    1. Application submitted
    2. Zoning review

    See this permit on One Stop

  61. Permit Plumbing Permit Permit Finaled

    Renovation

    Permit
    24-29883-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,460
    Contractor
    Bueche Corey
    Days from application to issue
    0
    Expires
    Apr 1, 2025

    See this permit on One Stop

  62. Permit Accessory Structure Inspection Phase

    Tulane will be reconstructing Engineering Road within the Tulane property limits. The existing asphalt and concrete roadway and parking will be removed. New concrete roadway and permeable parking with subsurface drainage will be installed. The purpose of this work is to reach the underground stormwater storage requirements of the Tulane University Stormwater Management Master Plan. This permit is only being submitted to record the Stormwater Management Plan with the City of New Orleans. This permit should be routed through Jay Dufour and/or Jessika Thibodeaux for review.

    Permit
    24-29373-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $0
    Fees
    $120
    Contractor
    Broadmoor LLC
    Days from application to issue
    33
    Expires
    Apr 29, 2025
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  63. Permit Plumbing Permit Permit Issued

    plumbing permit

    Permit
    24-29377-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $100
    Contractor
    Site pro services llc
    Days from application to issue
    18
    Expires
    Apr 14, 2025

    See this permit on One Stop

  64. Permit Electrical Service / Circuit / Feeder Permit Issued

    Installation of 2 circuits for decorative lighting in a Plot garden on Tulane university's campus.

    Permit
    24-28342-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $24,700
    Fees
    $276
    Contractor
    Kirk Joseph Boudreaux
    Days from application to issue
    29
    Expires
    Apr 16, 2025
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  65. Permit Mechanical Fuel Gas Other

    Running new gas line for restaurant.

    Permit
    24-27693-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $171,900
    Fees
    $60
    Contractor
    Mayer Building Company
    Days from application to issue
    33
    Expires
    Apr 9, 2025
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  66. Permit Mechanical HVAC Other

    Installing air handling unit, DOAS unit, and exhaust fan.

    Permit
    24-27691-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $171,900
    Fees
    $65
    Contractor
    Mayer Building Company
    Days from application to issue
    33
    Expires
    Apr 9, 2025
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  67. Permit Plumbing Permit Permit Finaled

    Plumbing for new restaurant grease waste and sanitary waste.

    Permit
    24-27689-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $140
    Contractor
    Douglas Anthony Guthans
    Days from application to issue
    17
    Expires
    Mar 23, 2025

    See this permit on One Stop

  68. Permit Street Cut Other

    CUTS: Four 4x4 sidewalk CUT LOCATIONS: 29.94770,-90.11839 29.94700,-90.11903 29.94638,-90.11798 29.94566,-90.11679 Pull through of fiber optic cable in existing conduit starting at existing HH::501856489 on the East corner of Birch St. & Pine St., heading NE approx. 1025' to existing HH::501856492 on the SE corner of Pine St. and Cohn St. continuing SE along Cohn St. approx. 343' to existing HH::501856493 on the SE corner of Cohn St. & Broadway St. Underground directional bore of 2” HPDE duct and fiber optic cable from existing HH::501856493 on the SE corner of Cohn St. & Broadway St. heading SW approx. 346' along the East side of Broadway St. to proposed HH::502513142 on the NE corner of Broadway St. & Hickory St., turning SE and heading approx. 400' along the northern side of Hickory St. to bore slot, then another 460' to proposed HH::502513145 on the northern side of Hickry St., then another 11' to end at existing HH::502513146

    Permit
    24-27586-RSTC
    Type
    Street Cut
    Work
    Street Cut
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,016
    Contractor
    ADB Companies
    Days from application to issue
    48
    Expires
    Apr 23, 2025

    See this permit on One Stop

  69. Permit Street Cut Permit Issued

    New Sewer Drop Manhole Connections for Tulane's new Student Housing Buildings that are being built in the same location of old dorm buildings.

    Permit
    24-26783-RSTC
    Type
    Street Cut
    Work
    Street Cut
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,040
    Days from application to issue
    9
    Expires
    Mar 6, 2025

    See this permit on One Stop

  70. Permit Electrical Repair / Replacement / Addition Other

    This permit will be for the electrical renovation work required for the build out of the TWISTED TACO. The existing restaurant SAGE DELI will be demoed, and new power and lighting circuits will be run per twisted tacos drawings.

    Permit
    24-26671-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $99,551
    Fees
    $286
    Contractor
    Ryan Carl Orgeron
    Days from application to issue
    7
    Expires
    Mar 4, 2025
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  71. Permit Renovation (Non-Structural) In Review

    Interior build-out of an existing empty laboratory shell space

    Permit
    24-23986-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $350,000
    Fees
    $2,160
    1. Application submitted
    2. Zoning review

    See this permit on One Stop

  72. Permit New Construction Application Accepted

    plumbing

    Permit
    24-22438-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $24,520
    Fees
    $245
    1. Application submitted

    See this permit on One Stop

  73. Permit Renovation (Non-Structural) Other

    INTERIOR RENOVATION OF EXISTING RESTAURANT.

    Permit
    24-18897-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $692,451
    Fees
    $4,218
    Days from application to issue
    64
    Expires
    Feb 27, 2025
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  74. Permit Moving Equipment Other

    Furnish and Install Four (4) Traction Elevators

    Permit
    24-19349-MOVG
    Type
    Moving Equipment
    Work
    Moving Equipment
    Estimated cost (applicant’s figure)
    $0
    Fees
    $290
    Contractor
    Otis Elevator
    Days from application to issue
    0
    Expires
    Dec 24, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  75. Permit New Construction Permit Cancelled

    TEMPORARY Indoor Practice Facility for University Sports programs. Building is a pre-engineered inflatable structure that will be deflated during tropical weather events.

    Permit
    24-17256-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $3,300,000
    Fees
    $19,860
    Contractor
    C M Combs Construction LLC
    1. Application submitted

    See this permit on One Stop

  76. Permit Street Cut Permit Issued

    30230 - Rehabilitation of segment 055-046 to 055-47 and pavement restoration.

    Permit
    24-16369-RSTC
    Type
    Street Cut
    Work
    Street Cut
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    349
    Expires
    Nov 9, 2025

    See this permit on One Stop

  77. Permit Street Cut Permit Issued

    30230 - Rehabilitation of segment 055-010 to 055-046 and pavement restoration.

    Permit
    24-16368-RSTC
    Type
    Street Cut
    Work
    Street Cut
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    95
    Expires
    Feb 28, 2025

    See this permit on One Stop

  78. Permit Street Cut Permit Issued

    30230 - Sewer main rehab and pavement restoration.

    Permit
    24-16200-RSTC
    Type
    Street Cut
    Work
    Street Cut
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    90
    Expires
    Feb 21, 2025

    See this permit on One Stop

  79. Permit Electrical Service / Circuit / Feeder Other

    Bruff Quad Phase II includes the construction of two new dormitory projects. Paterson will be a 95,000 GSF, 6-story, 386-student dormitory. This will include a new service and branch panels.

    Permit
    24-16061-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $3,382,680
    Fees
    $5,449
    Contractor
    Trosclair Todd
    Days from application to issue
    15
    Expires
    Dec 7, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  80. Permit Electrical Service / Circuit / Feeder Other

    Bruff Quad Phase II includes the construction of two new dormitory projects. Fogelman will be a 105,000 GSF, 7-story, 393 student dormitory. This will include new service and branch panels.

    Permit
    24-16053-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $4,048,504
    Fees
    $6,175
    Contractor
    Trosclair Todd
    Days from application to issue
    15
    Expires
    Dec 7, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  81. Permit Plumbing Permit Permit Finaled

    Rough in and installation of new bathroom and Coffee Breakroom

    Permit
    24-13042-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $100
    Contractor
    Bueche Corey
    Days from application to issue
    5
    Expires
    Nov 7, 2024

    See this permit on One Stop

  82. Permit Mechanical HVAC Permit Finaled

    Install new ductwork, grills and controls as per plans

    Permit
    24-11846-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $19,680
    Fees
    $255
    Days from application to issue
    0
    Expires
    Oct 24, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

    Placed here by its tax bill number from “7 McAlister Dr”.

  83. Permit Plumbing Permit Permit Finaled

    Rough in for sink and water heater. Provide and install a new sink and faucet. Provide and install an under-counter ice maker as per plans received.

    Permit
    24-10775-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $50
    Contractor
    Randy Deslatte
    Days from application to issue
    3
    Expires
    Oct 15, 2024

    See this permit on One Stop

    Placed here by its tax bill number from “7 McAlister Dr”.

  84. Permit Electrical Repair / Replacement / Addition Permit Finaled

    Interior Renovation of a portion of existing Business School First Floor. Using all existing circuitry and no new service.

    Permit
    24-10766-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $158,000
    Fees
    $70
    Contractor
    Kirk J Boudreaux
    Days from application to issue
    17
    Expires
    Oct 29, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

    Placed here by its tax bill number from “7 McAlister Dr”.

  85. Permit Electrical Service / Circuit / Feeder Other

    Renovating office area, replacing light fixtures, changing to new receptacles. Adding a new panel with 60 new circuits.

    Permit
    24-09903-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $368,000
    Fees
    $280
    Contractor
    Kirk Joseph Boudreaux
    Days from application to issue
    21
    Expires
    Oct 25, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  86. Permit Dumpster/Construction Zone Other

    Crane Placement

    Permit
    24-04258-RCZD
    Type
    Dumpster/Construction Zone
    Work
    Dumpster/Construction Zone
    Estimated cost (applicant’s figure)
    $0
    Fees
    $100

    See this permit on One Stop

  87. Permit HDLC COA Permit Cancelled

    Equipment Upgrades at an existing wireless facility. No change to the facility height or ground area is proposed.

    Permit
    24-03297-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Aug 5, 2024

    See this permit on One Stop

  88. Permit Renovation (Non-Structural) Permit Issued

    Equipment Upgrades at an existing wireless facility. No change to the facility height or ground area is proposed.

    Permit
    24-03297-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $35,000
    Fees
    $443
    Contractor
    Mastec Network Solutions Inc
    Days from application to issue
    88
    Expires
    Oct 30, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  89. Permit HDLC COA Permit Cancelled

    Interior renovation of a portion of existing Business School First Floor.

    Permit
    24-02037-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Jul 24, 2024

    See this permit on One Stop

    Placed here by its tax bill number from “7 McAlister Dr”.

  90. Permit Renovation (Non-Structural) Occupancy

    Interior renovation of a portion of existing Business School First Floor. All work to be done as per plans.

    Permit
    24-02037-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $519,835
    Fees
    $3,180
    Days from application to issue
    80
    Expires
    Oct 12, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

    Placed here by its tax bill number from “7 McAlister Dr”.

  91. Permit Renovation (Non-Structural) Other

    The scope of work included in this permit shall be the changing finishes, replacing portions of a walkway handrail, reorganizing an individual use restroom, reorganizing non-load bearing walls, providing new lighting fixtures, and installing tiered seating.

    Permit
    24-01502-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $2,908,927
    Fees
    $17,514
    Contractor
    Pangea Construction LLC
    Days from application to issue
    73
    Expires
    Oct 1, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  92. Permit Electrical Service / Circuit / Feeder Permit Issued

    Dormitory Underground conduits being installed for future project

    Permit
    24-01171-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $40,500
    Fees
    $40
    Contractor
    Trosclair Todd
    Days from application to issue
    12
    Expires
    Jul 24, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  93. Permit Electrical Service / Circuit / Feeder Permit Cancelled

    Dormitory Installing underground conduits for future project

    Permit
    24-01167-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $44,350
    Fees
    $40
    Contractor
    Trosclair Todd
    Days from application to issue
    12
    Expires
    Jul 24, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  94. Permit Mechanical Fuel Gas Other

    Gas Piping for New 7 Story Building

    Permit
    24-00981-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $1,750,000
    Fees
    $124
    Contractor
    Andrew Barber
    Days from application to issue
    20
    Expires
    Jul 31, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  95. Permit Mechanical Fuel Gas Other

    gas piping for 6 Story Building. Run 300ft of new Gas Line in 2 New Bldgs.3 Electric Water Heaters, 1 Generators.

    Permit
    24-00900-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $1,750,000
    Fees
    $134
    Contractor
    Andrew Barber
    Days from application to issue
    21
    Expires
    Jul 31, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  96. Permit Mechanical HVAC Other

    Mechanical Filing for 6 story building to include all associated ductwork and mechanical piping. Includes 49 VAVs

    Permit
    24-00848-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $1,750,000
    Fees
    $3,001
    Contractor
    Andrew Barber
    Days from application to issue
    21
    Expires
    Jul 31, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  97. Permit Mechanical HVAC Other

    Mechanical Filing for 7 story building to include all Mechanical equipment Associated Ductwork and Piping, 59 VAV's

    Permit
    24-00844-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $1,750,000
    Fees
    $3,162
    Contractor
    Andrew Barber
    Days from application to issue
    21
    Expires
    Jul 31, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  98. Permit Plumbing Permit Permit Issued

    Plumbing filing for 678 Fixtures in a New 6 story Building called (Patterson) on Tulane Main Campus

    Permit
    24-00841-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $6,380
    Contractor
    Bernhardmrc
    Days from application to issue
    1
    Expires
    Jul 11, 2024

    See this permit on One Stop

  99. Permit Plumbing Permit Permit Issued

    Plumbing filing for 734 fixtures in a new 7 story Building Called (Fogelman) on Tulane Main Campus.

    Permit
    24-00821-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $6,540
    Contractor
    Bernhardmrc
    Days from application to issue
    1
    Expires
    Jul 11, 2024

    See this permit on One Stop

  100. Permit Mechanical HVAC Permit Finaled

    Installing new HVAC unite including associated ductwork.

    Permit
    24-00412-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $104,631
    Fees
    $75
    Days from application to issue
    13
    Expires
    Jul 18, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  101. Permit Mechanical Fuel Gas Permit Cancelled

    gas piping for 6 Story Building. Run 300ft of new Gas Line in 2 New Bldgs.3 Electric Water Heaters, 1 Generators.

    Permit
    24-00233-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $3,750,000
    Fees
    $134
    1. Application submitted

    See this permit on One Stop

  102. Permit Mechanical HVAC Permit Cancelled

    Underground and above Ground Mechanical Piping. HVAC Equipment and associated Ductwork. All New Construction. Includes 108 VAVs on this project.

    Permit
    24-00142-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $3,750,000
    Fees
    $6,104
    Contractor
    Andrew Barber
    1. Application submitted

    See this permit on One Stop

  103. Permit Plumbing Permit Permit Finaled

    Minor plumbing renovation for Tulane Swim Team Locker Room. Includes new plumbing rough in and install of the following fixtures: showers, water closets, lavs, floor drains, and a swim suit extractor.

    Permit
    24-00003-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $70
    Contractor
    August R Gallo, Jr.
    Days from application to issue
    3
    Expires
    Jul 4, 2024

    See this permit on One Stop

  104. Permit Electrical Repair / Replacement / Addition Other

    Electrical work for build out of two spaces in existing building; (1) small food service/smoothie bar and (1) convenience store.

    Permit
    23-34009-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $93,000
    Fees
    $160
    Contractor
    Jared Lemoine
    Days from application to issue
    1
    Expires
    Jun 28, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  105. Permit Plumbing Permit Permit Issued

    Installing new piping, fixtures and equipment.

    Permit
    23-34849-PLMB
    Type
    Plumbing Permit
    Work
    Plumbing Permit
    Estimated cost (applicant’s figure)
    $0
    Fees
    $210
    Contractor
    Kurt Michael Zeringue
    Days from application to issue
    6
    Expires
    Jun 27, 2024

    See this permit on One Stop

  106. Permit Renovation (Non-Structural) Permit Issued

    Equipment upgrades at an existing wireless facility.

    Permit
    23-34315-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $35,000
    Fees
    $295
    Contractor
    Mastec Network Solutions Inc
    Days from application to issue
    14
    Expires
    Jun 29, 2024
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  107. Permit Interior Demolition Other

    The proposed scope of work included in this interior demolition shall be removing finishes, ACT grids, non-load bearing walls, ductwork, and plumbing fixtures. No use & occupancy. Renovation requires a separate permit.

    Permit
    23-34014-DEMI
    Type
    Interior Demolition
    Work
    Interior Demolition
    Estimated cost (applicant’s figure)
    $59,174
    Fees
    $420
    Contractor
    Pangea Construction LLC
    Days from application to issue
    36
    Expires
    Jul 18, 2024
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  108. Permit Moving Equipment Permit Finaled

    Furnish and Install Two ( 2 ) Traction Elevators

    Permit
    23-29670-MOVG
    Type
    Moving Equipment
    Work
    Moving Equipment
    Estimated cost (applicant’s figure)
    $0
    Fees
    $160
    Contractor
    Otis Elevator
    Days from application to issue
    0
    Expires
    Apr 27, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  109. Permit Accessory Structure Permit Issued

    Tulane will be installing new turf for the baseball field at Turchin Stadium, 3000 Ben Weiner Dr, New Orleans, LA 70118. The existing turf will be removed, with minimal disturbance to the existing base material. The new turf will be installed over the existing base material in the same location as the previous turf. This permit is not for any physical work with the turf on site. The purpose of this permit is to record the Stormwater Management Plan with the City of New Orleans, for the existing base material on site. There is 6" of permeable base material under the field that has been field verified. The 6" of permeable base material is being counted as stormwater storage for the Tulane Master Plan for Stormwater Management. This permit should be routed through Jay Dufour and/or Jessika Thibodeaux for review.

    Permit
    23-28803-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $1
    Fees
    $125
    Days from application to issue
    62
    Expires
    Jun 20, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

    Placed here by its tax bill number from “2951 Ben Weiner Dr”.

  110. Permit Electrical Repair / Replacement / Addition Permit Issued

    Renovation of existing locker room space for the swim team. Modifying the electrical systems and lighting.

    Permit
    23-27569-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $41,480
    Fees
    $139
    Contractor
    Kirk J Boudreaux
    Days from application to issue
    7
    Expires
    Apr 16, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  111. Permit New Construction Permit Cancelled

    Underground MEP

    Permit
    23-26918-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $3,000,000
    Fees
    $18,060
    Contractor
    All Star Electric,Inc
    1. Application submitted

    See this permit on One Stop

  112. Permit Mechanical HVAC Permit Finaled

    New HVAC system to include 42- VAVs located, 2- Rooftop Units, 2- Outside Air Rooftop Units, 1 Air handler on the first floor, 27- Vertical Fan Coil Units, 1 VRF condenser with 7- wall hung units and 5 exhaust fans. Building is 5 floors with VAVs and Vertical Fan coils on each floor. Including all associated ductwork and mechanical piping for the project.

    Permit
    23-25810-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $1,160,000
    Fees
    $910
    Contractor
    Andrew Barber
    Days from application to issue
    45
    Expires
    May 6, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  113. Permit Mechanical Fuel Gas Permit Finaled

    Installation of gas line from existing meter location to the roof of the building. This gas line will feed (1) one generator. Includes two water heaters.

    Permit
    23-25799-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $111,100
    Fees
    $213
    Contractor
    Andrew Barber
    Days from application to issue
    35
    Expires
    Apr 24, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  114. Permit Mechanical HVAC Permit Finaled

    Added CHW, HHW, and Pool Heating Water Piping that serves the owner supplied Pool Pack Units; provided all ductwork as well. Furnished and installed mechanical equipment consisting of pumps, fans, heat exchangers, unit heaters, and a reheat coil.

    Permit
    23-21188-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $1,603,213
    Fees
    $80
    Contractor
    August R Gallo, Jr.
    Days from application to issue
    47
    Expires
    Mar 18, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  115. Permit Mechanical Fuel Gas Permit Finaled

    Run New reconnecting gas lines to new Boilers. (2)

    Permit
    23-19179-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $65,000
    Fees
    $166
    Contractor
    Andrew Barber
    Days from application to issue
    7
    Expires
    Jan 21, 2024
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  116. Permit New Construction Other

    Bruff Quad Phase II includes the construction of two new dormitory projects. Fogelman will occupy the current Irby Hall site and Paterson will occupy the current Paterson Hall site. Both existing Irby Hall and existing Paterson Hall are currently being demolished under separate permits in advance of the construction of this project. Fogelman will be a 105,000 GSF, 7-story, 393 student dormitory and Paterson will be a 95,000 GSF, 6-story, 386 student dormitory. Both buildings will be built at the same time near each other and are both governed by Tulane's Institutional Master Plan. This permit application includes Paterson building only (Fogelman was submitted under separate cover – Reference Code YMHESV). SITE/CIVIL/ UG MEP/FOUNDATION RELEASED 8-30-23 STRUCTURAL FRAME RELEASED 10-3-23

    Permit
    23-17614-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $41,711,867
    Fees
    $250,382
    Contractor
    Broadmoor LLC
    Days from application to issue
    252
    Expires
    Sep 7, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  117. Permit New Construction Other

    Bruff Quad Phase II includes the construction of two new dormitory projects. Fogelman will occupy the current Irby Hall site and Paterson will occupy the current Paterson Hall site. Both existing Irby Hall and Paterson Hall are being demolished under separate permits in advance of the construction of this project. Fogelman will be a 105,000 GSF, 7-story, 393 student dormitory and Paterson will be a 95,000 GSF, 6-story, 386 student dormitory. Both buildings will be built at the same time near each other and are both governed by Tulane's Institutional Master Plan. This permit application includes Fogelman and all the sitework associated with the Bruff Quad Phase IIA project. A separate permit application will be made for Paterson (Permit Application Reference Code 4NUSZ0). SITE AND FOUNDATION RELEASE ISSUED 8-30-23 STRUCTURAL FRAME RELEASED 10-3-23

    Permit
    23-17565-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $49,922,155
    Fees
    $299,698
    Contractor
    Broadmoor LLC
    Days from application to issue
    252
    Expires
    Sep 7, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  118. Permit Renovation (Non-Structural) Permit Issued

    Hazard mitigation of the basement level of the existing building consisting of dry flood proofing of the existing interior walls of the basement, installation of flood doors, sump pits with pumps, associated structural, electrical, mechanical and plumbing work. All work to be done as per plans.

    Permit
    23-15942-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $2,340,000
    Fees
    $14,100
    Contractor
    Landis Construction Co LLC
    Days from application to issue
    212
    Expires
    Jul 10, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  119. Permit Renovation (Non-Structural) Permit Issued

    Hazard mitigation of the basement level of the existing building consisting of dry flood proofing of the interior face of the basement walls, installation of flood doors, sump pits with pumps and associated structural, electrical, mechanical and plumbing work. All work to be done as per plans.

    Permit
    23-15933-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $1,400,000
    Fees
    $8,460
    Contractor
    Landis Construction Co LLC
    Days from application to issue
    212
    Expires
    Jul 10, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  120. Permit Renovation (Non-Structural) Permit Issued

    Roofing, waterproofing and HVAC modifications

    Permit
    23-14924-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $3,048,954
    Fees
    $18,354
    Days from application to issue
    47
    Expires
    Jan 18, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

    Placed here by the building address from “6823 Saint Charles Ave, Bldg 32, Weinmann Hall”.

  121. Permit Mechanical HVAC Permit Finaled

    replacing 2 AHU'S and 2 Boilers

    Permit
    23-14781-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $1,517,000
    Fees
    $363
    Days from application to issue
    2
    Expires
    Dec 2, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  122. Permit Renovation (Non-Structural) Other

    FIT OUT OF TWO SHELL SPACES AS RETAIL USES ON FIRST FLOOR OF EXISTING 7 STORY DORMITORY BUILDING. ONE TO BE A SMALL FOOD SERVICE SMOOTHIE BAR. ONE TO BE A CONVIENENCE STORE. TEMPORARY OCCUPANCY FOR THE SHAKE SECTION OF THE FOOD SERVICE FOR 180 DAYS STARTING 8/9/24 TEMPORARY OCCUPANCY FOR THE CONVENIENCE STORE FOR 30 DAYS STARTING 1-10-25 FINAL CERTIFICATE OF OCCUPANCY ISSUED 2-18-2025

    Permit
    23-14556-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $733,035
    Fees
    $4,589
    Days from application to issue
    191
    Expires
    Jun 6, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  123. Permit Construction Loop Permit Finaled

    Installation of the service for temporary trailers on Tulane Campus for locker rooms.

    Permit
    23-13010-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $15,750
    Fees
    $40
    Contractor
    J J Boudreaux J J Kirk J
    Days from application to issue
    0
    Expires
    Nov 12, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  124. Permit Small Cell Installation Other

    NO_UNIVERSITY_062_LA - Replace existing wood utility pole with wood pole for small cell installation N side Willow St in front of 6501 Willow St.

    Permit
    22-29552-SMCL
    Type
    Small Cell Installation
    Work
    Small Cell Installation
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,000
    1. Application submitted
    2. Application review
    3. Permit approved

    See this permit on One Stop

  125. Permit Electrical Repair / Replacement / Addition Permit Finaled

    Addition and construction of interior wall, ceiling of electrical installation and adding hydrotherapy equipment. Will be using 90 percent existing circuitry.

    Permit
    23-11711-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $367,305
    Fees
    $100
    Contractor
    J J Boudreaux J J Kirk J
    Days from application to issue
    10
    Expires
    Nov 12, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  126. Permit Renovation (Non-Structural) Permit Issued

    RENOVATION OF EXISTING LOCKER ROOM SPACE. THE SCOPE OF WORK INCLUDES CREATING A NEW DEDICATED LOCKER ROOM SPACE WITHIN THE EXISTING LOCKER ROOM SPACE, MODIFYING THE EXISTING MECHANICAL SYSTEMS, MODIFYING THE ELECTRIAL SYSTEMS AND LIGHTING, AND REPLACING FINISHES.

    Permit
    23-11418-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $769,496
    Fees
    $4,680
    Contractor
    The Lemoine Company
    Days from application to issue
    125
    Expires
    Feb 29, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  127. Permit Dumpster/Construction Zone Other

    We will be doing work at Tulane University commencing May 15th, 2023, for approximately 3 months. We need a right of way on St. Charles Avenue between Law Drive and Audubon Place of approximately 175 feet for the parking of our construction vehicles - there will be no cranes or dumpsters. Extension #1: 8/21/23 to 11/4/23

    Permit
    23-11399-RCZD
    Type
    Dumpster/Construction Zone
    Work
    Dumpster/Construction Zone
    Estimated cost (applicant’s figure)
    $0
    Fees
    $620
    Days from application to issue
    19
    Expires
    Nov 16, 2023

    See this permit on One Stop

  128. Permit Renovation (Non-Structural) Occupancy

    Change/Add antennas and equipment on an existing cellular rooftop installation. There will be no change in height.

    Permit
    23-09133-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $82,120
    Fees
    $558
    Contractor
    Network Installation Specialists LLC
    Days from application to issue
    16
    Expires
    Nov 10, 2023
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  129. Permit Accessory Structure Permit Cancelled

    Construction of new structures less than two-thousand five (2,500) square feet in gross floor area that are adjunct to and support an existing use on campus. Structures are to support the existing Wilson Athletic Facility. Construction of two temprorary locker trailers.

    Permit
    23-10417-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $45,750
    Fees
    $350
    Contractor
    HI TECH ELECTRICAL
    1. Application submitted
    2. Zoning review

    See this permit on One Stop

  130. Permit Demolition Permit Issued

    Demolition of an existing residential dormitory on Tulane University Campus for future use in conformance with Tulane Institutional Master Plan. Paterson Hall Demolition

    Permit
    23-09011-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $2,215
    Contractor
    Broadmoor LLC
    Days from application to issue
    45
    Expires
    Nov 22, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  131. Permit Demolition Permit Issued

    Demolition of existing residential dormitory hall on Tulane University campus. Phelps Hall Demolition

    Permit
    23-09156-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $2,130
    Contractor
    Broadmoor LLC
    Days from application to issue
    45
    Expires
    Nov 22, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  132. Permit Demolition Permit Issued

    Demolition of existing residential dormitory on Tulane University Campus. Irby Hall Demolition

    Permit
    23-09273-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $3,000
    Contractor
    Broadmoor LLC
    Days from application to issue
    45
    Expires
    Nov 22, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  133. Permit Demolition Permit Cancelled

    Demolition of an existing residential hall on Tulane University Campus in preparation for a new residential dormitory.

    Permit
    23-08999-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $4,500
    Contractor
    Broadmoor LLC
    1. Application submitted

    See this permit on One Stop

  134. Permit Demolition Permit Cancelled

    Demolition of existing residential dormitory on Tulane University Campus. Site is to be cleared in preparation for a new residential dormitory in conformance with Tulane Institutional Master Plan.

    Permit
    23-08838-DEMO
    Type
    Demolition
    Work
    Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $3,195
    Contractor
    Broadmoor LLC
    1. Application submitted

    See this permit on One Stop

  135. Permit Mechanical Fuel Gas Permit Issued

    ROOF - Run 200' gas line and hook-up to two (2) generators. NOTE: Generators furnished and installed by others. Building Permit is 20-25417-NEWC. Additionally the Permit #: 21-14861-FGAS is for the 2 gas HWHs on the 1st floor, no inspections were made yet. Permit #: 22-10901-FGAS is for the 80’ of gas line to new building, only U/G inspection was made, No Final. The GAS METER IS AT 6600 WILLOW ADDRESS

    Permit
    23-08564-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $9,995,000
    Fees
    $97
    Days from application to issue
    4
    Expires
    Oct 3, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  136. Permit Renovation (Non-Structural) Occupancy

    The scope of work included in this permit shall be the addition and construction of interior wall, ceiling, and floor finishes, lighting and plumbing fixtures, non-load bearing interior walls, and hydrotherapy equipment. All work to be done as per plans.

    Permit
    23-06324-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $5,500,000
    Fees
    $33,060
    Contractor
    Broadmoor LLC
    Days from application to issue
    44
    Expires
    Oct 26, 2023
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  137. Permit Mechanical HVAC Permit Cancelled

    Mechanical and Plumbing Underground

    Permit
    23-06294-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $118,000
    Fees
    $1,235
    1. Application submitted
    2. Application review
    3. Permit approved

    See this permit on One Stop

  138. Permit New Construction Occupancy

    Site and Infrastructure for Tulane University Temporary Locker Room Trailers. Pre-manufactured trailers to be installed by others. Temporary

    Permit
    23-06058-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $45,750
    Fees
    $350
    Days from application to issue
    63
    Expires
    Nov 9, 2023
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  139. Permit Renovation (Non-Structural) Permit Issued

    Adding safety railings and enclosures to Diboll parking garage located at Tulane University

    Permit
    23-04704-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $1,037,532
    Fees
    $6,288
    Contractor
    Crystal Clear Imaging
    Days from application to issue
    20
    Expires
    Sep 8, 2023
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  140. Permit Interior Demolition Inspection Phase

    The proposed scope of work included in this interior demolition shall be removing lockers, finishes, non-load bearing walls, ductwork, and plumbing fixtures. Interior demo only. No use or occupancy. Renovation requires separate permit.

    Permit
    23-04515-DEMI
    Type
    Interior Demolition
    Work
    Interior Demolition
    Estimated cost (applicant’s figure)
    $230,847
    Fees
    $1,446
    Contractor
    Broadmoor LLC
    Days from application to issue
    12
    Expires
    Aug 27, 2023
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  141. Permit Electrical Service / Circuit / Feeder Permit Finaled

    Installation of underground feeders, installing a new electrical system and circuits for renovation a school building on Tulane's campus.

    Permit
    22-31424-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $835,635
    Fees
    $2,440
    Contractor
    Kirk Joseph Boudreaux
    Days from application to issue
    57
    Expires
    Jun 14, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  142. Permit Electrical Repair / Replacement / Addition Permit Finaled

    Renovation of Existing Nanatorium Space and a exterior social pool area. Replacing pumps and light fixtures.

    Permit
    22-29064-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $409,250
    Fees
    $181
    Contractor
    J J Boudreaux J J Kirk J
    Days from application to issue
    7
    Expires
    Apr 3, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  143. Permit Construction Loop Permit Finaled

    Installing a construction loop for the job site office trailer.

    Permit
    22-29055-LOOP
    Type
    Construction Loop
    Work
    Construction Loop
    Estimated cost (applicant’s figure)
    $409,250
    Fees
    $40
    Contractor
    J J Boudreaux J J Kirk J
    Days from application to issue
    7
    Expires
    Apr 3, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  144. Permit Renovation (Structural) Permit Issued

    Remove old slate roofing, repair any damaged decking and install shingles

    Permit
    22-23677-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $204,838
    Fees
    $1,290
    Contractor
    BMSCAT
    Days from application to issue
    25
    Expires
    Mar 2, 2023
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  145. Permit Moving Equipment Permit Finaled

    Installation Of Two ( 2 ) Gen 3 Traction Elevators. ( DUPLEX )

    Permit
    22-22403-MOVG
    Type
    Moving Equipment
    Work
    Moving Equipment
    Estimated cost (applicant’s figure)
    $0
    Fees
    $160
    Contractor
    Otis Elevator
    Days from application to issue
    0
    Expires
    Jan 26, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  146. Permit Moving Equipment Permit Issued

    Installation Of A Buckhoist On The Outside Of Building.

    Permit
    22-21734-MOVG
    Type
    Moving Equipment
    Work
    Moving Equipment
    Estimated cost (applicant’s figure)
    $0
    Fees
    $250
    Contractor
    Broadmoor LLC
    Days from application to issue
    0
    Expires
    Jan 20, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  147. Permit Renovation (Structural) In Review

    Replace the aging "S" type tile roofing system with a new "S" type tile roofing system. This tile should be on-site sometime around September 15th. Remove and replace should take 3 months.

    Permit
    22-20644-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $448,000
    Fees
    $2,748
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review

    See this permit on One Stop

  148. Permit Renovation (Structural) Permit Issued

    Replacing the old roofing system on buildings (96A,96B, and 96C) with a new built-up roofing system. This work should take 4 weeks with good weather

    Permit
    22-20630-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $175,000
    Fees
    $1,110
    Days from application to issue
    35
    Expires
    Feb 15, 2023
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

    Placed here by an address range from “120-160 Janet Yulman Way”.

  149. Permit Renovation (Structural) Other

    Removing the old ballast roofing system and replacing it with a new TPO roofing system This should take 14 days with good weather. We will be using a dumpster from Tulane located inside an allocated parking area and traffic will not be impeded.

    Permit
    22-20619-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $200,000
    Fees
    $1,260
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved

    See this permit on One Stop

  150. Permit Accessory Structure Permit Issued

    The project scope of work is to provide a programmed site for the National Pan-Hellenic Council Plots within the Uptown campus of Tulane University. The site limit of work area is approx. 6,187 sf and is located within the Academic Quad, between Richardson Building, Stanley Thomas, and Walter E. Blessey Hall. The following site improvements include a series of modular precast concrete walls, regrading site for positive drainage, new concrete pavement, readjustment of existing utilities, 3 new landscape up lights, a GFCI electrical outlet, new tree planting, and lawn to be repaired as needed.

    Permit
    22-19264-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $571,675
    Fees
    $3,492
    Contractor
    Broadmoor LLC
    Days from application to issue
    611
    Expires
    Aug 28, 2024
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  151. Permit Mechanical Fuel Gas Permit Finaled

    Gas line 100 ft, 5 outlets, Generator 1 over 200k BTU

    Permit
    22-18469-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $9,000,000
    Fees
    $50
    Days from application to issue
    84
    Expires
    Mar 12, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  152. Permit New Construction Application Accepted

    This mechanical lift permit application is related to the Tulane Paul Hall Science and Engineering Building, Permit Number 21-32026-NEWC. This lift application is a formal request for our material hoist.

    Permit
    22-18079-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $42,000,000
    Fees
    $252,060
    Contractor
    Broadmoor, LLC
    1. Application submitted

    See this permit on One Stop

  153. Permit Renovation (Structural) Other

    Renovation of the historic Richardson Memorial Hall (new interiors and envelope) with a small new construction addition at the back of the building for required code upgrades. Building currently houses the Tulane University School of Architecture. All work to be done as per plans. CURRENT RELEASE AS OF 5-24-23 IS STRUCTURAL STEEL ERECTION. PREVIOUS RELEASES INCLUDED SITEWORK, UNDERGROUND MEP, FOUNDATION. TEMPORARY CERTIFICATE OF OCCUPANCY ISSUED 2-11-2025 FOR 90 DAYS

    Permit
    22-17852-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $32,763,146
    Fees
    $196,644
    Contractor
    Broadmoor LLC
    Days from application to issue
    442
    Expires
    Feb 29, 2024
    1. Application submitted
    2. First inspection
    3. Application review
    4. Zoning review
    5. Plan review
    6. Permit approved
    7. Issue date

    See this permit on One Stop

  154. Permit Interior Demolition Other

    Interior demolition of non-structural partitions, architectural finishes, mechanical equipment, electrical equipment, plumbing, and fire protection. No use & occupancy. Renovation requires a separate permit.

    Permit
    22-17849-DEMI
    Type
    Interior Demolition
    Work
    Interior Demolition
    Estimated cost (applicant’s figure)
    $0
    Fees
    $120
    Contractor
    Broadmoor LLC
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved

    See this permit on One Stop

  155. Permit Mechanical HVAC Permit Finaled

    5 Electric Furnancet-Air Handlers

    Permit
    22-07657-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $9,000,000
    Fees
    $205
    Contractor
    Kenneth E Gootee
    Days from application to issue
    91
    Expires
    Mar 12, 2023
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  156. Permit Mechanical Fuel Gas Permit Cancelled

    New Construction of Science and Engineering Education Building on Tulane University Campus.

    Permit
    22-07659-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $9,000,000
    Fees
    $15
    Contractor
    Gootee Construction
    1. Application submitted

    See this permit on One Stop

  157. Permit Permanent Generator Other

    2 Generators on the Rooftop of a new construction Dormitory Building.

    Permit
    22-11091-EGEN
    Type
    Permanent Generator
    Work
    Permanent Generator
    Estimated cost (applicant’s figure)
    $6,970,000
    Fees
    $238
    Contractor
    Blanchard Timothy
    1. Application submitted
    2. Application review

    See this permit on One Stop

  158. Permit Mechanical Fuel Gas Permit Finaled

    Run 80 feet of gas line to new building.

    Permit
    22-10901-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $9,995,000
    Fees
    $15
    Days from application to issue
    1
    Expires
    Oct 13, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  159. Permit Electrical Repair / Replacement / Addition Permit Issued

    Replacement of existing lighting, installation of new general use receptacles, installation of new tele/data infrastructure.

    Permit
    22-09235-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $34,995
    Fees
    $55
    Contractor
    Henry Albert Rocker
    Days from application to issue
    3
    Expires
    Oct 1, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  160. Permit Moving Equipment Permit Finaled

    Installation Of Four (4) Elevators

    Permit
    22-06270-MOVG
    Type
    Moving Equipment
    Work
    Moving Equipment
    Estimated cost (applicant’s figure)
    $0
    Fees
    $290
    Contractor
    Schindler Elevator Corporation
    Days from application to issue
    0
    Expires
    Sep 2, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  161. Permit Electrical Service / Circuit / Feeder Permit Finaled

    Installation of a new electrical system in Tulane University Science Building.

    Permit
    22-05635-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $2,274,530
    Fees
    $2,770
    Contractor
    J J Boudreaux J J Kirk J
    Days from application to issue
    2
    Expires
    Aug 24, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  162. Permit HDLC COA Permit Cancelled

    RENOVATION OF EXISTING NATATORIUM SPACE AND EXTERIOR SOCIAL POOL AREA. THE SCOPE OF WORK INCLUDES INSTALLING A NEW POOL LINING SYSTEM WITHIN EXISTING POOL FOOTPRINT, REMOVING CORROSION FROM THE BUILDING STRUCTURE, REPLACING THE POOL EQUIPMENT/ACCESSORIES, REPAIRING THE EXISTING STRUCTURAL SYSTEM, REPLACING THE MECHANICAL SYSTEMS, REPLACING THE ELECTRIAL SYSTEMS AND LIGHTING, REPLACING THE TILE DECK, AND REPAIRING AND PAINTING THE INTERIOR OF THE NATATORIUM FOR PROPER LIGHTING.

    Permit
    22-00894-HDLC
    Type
    HDLC COA
    Work
    HDLC COA
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Aug 1, 2022

    See this permit on One Stop

  163. Permit New Construction In Review

    Storm water management project only. Project includes the construction of two (2) sub-surface detention systems. One will be built on the LBC Quad and the other will be built on the Newcomb Quad.

    Permit
    22-01545-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $500,000
    Fees
    $3,060
    1. Application submitted
    2. Zoning review

    See this permit on One Stop

  164. Permit Renovation (Structural) Permit Issued

    RENOVATION OF EXISTING NATATORIUM SPACE AND EXTERIOR SOCIAL POOL AREA. THE SCOPE OF WORK INCLUDES INSTALLING A NEW POOL LINING SYSTEM WITHIN EXISTING POOL FOOTPRINT, REMOVING CORROSION FROM THE BUILDING STRUCTURE, REPLACING THE POOL EQUIPMENT/ACCESSORIES, REPAIRING THE EXISTING STRUCTURAL SYSTEM, REPLACING THE MECHANICAL SYSTEMS, REPLACING THE ELECTRIAL SYSTEMS AND LIGHTING, REPLACING THE TILE DECK, AND REPAIRING AND PAINTING THE INTERIOR OF THE NATATORIUM FOR PROPER LIGHTING. ALL WORK TO BE DONE AS PER PLANS.

    Permit
    22-00894-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $9,356,145
    Fees
    $56,202
    Contractor
    Lemoine Company, Grace Hebert Curtis Architects
    Days from application to issue
    252
    Expires
    Mar 20, 2023
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  165. Permit Dumpster/Construction Zone Other

    Bus Parking Zone / Special Event

    Permit
    21-33103-RCZD
    Type
    Dumpster/Construction Zone
    Work
    Dumpster/Construction Zone
    Estimated cost (applicant’s figure)
    $0
    Fees
    $190
    Days from application to issue
    4
    Expires
    Jun 3, 2022

    See this permit on One Stop

  166. Permit Renovation (Non-Structural) Permit Issued

    Interior buildout of existing bank space in Tulane University Lavin-Bernick Center. Installation of interior storefront partitions and new finishes. Mechanical limited to relocation of diffuser. Electrical limited to replacement of fluorescent fixture to LED and relocation of light switch.

    Permit
    21-32876-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $250,000
    Fees
    $1,560
    Contractor
    Boudreaux Nathan Builders Inc
    Days from application to issue
    124
    Expires
    Sep 28, 2022
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  167. Permit New Construction Permit Issued

    The application is for a foundation package for a new science and engineering building on Tulane's Uptown campus. Foundation and Underground Released 2-22-2022 Structural Frame Released 4-8-2022

    Permit
    21-32026-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $41,957,718
    Fees
    $251,808
    Contractor
    Broadmoor LLC
    Days from application to issue
    219
    Expires
    Dec 23, 2022
    1. Application submitted
    2. Zoning review
    3. Application review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  168. Permit Mechanical HVAC Permit Finaled

    Install one range hood and associated duct work.

    Permit
    21-31675-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $25,555
    Fees
    $50
    Days from application to issue
    6
    Expires
    May 17, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  169. Permit Accessory Structure Occupancy

    Equipment Rack & charging station for electric Tulane shuttles

    Permit
    21-29774-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $170,125
    Fees
    $1,086
    Days from application to issue
    6
    Expires
    Apr 28, 2022
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  170. Permit Mechanical Fuel Gas Application Accepted

    ROOF - Run 200' gas line and hook-up to 2 - generators. NOTE: Generators furnished and installed by others.

    Permit
    21-28656-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $9,995,000
    Fees
    $97
    1. Application submitted

    See this permit on One Stop

  171. Permit Change of Address Permit Issued

    LAT 29.9431, LON -90.1163 Monopole Tower (21-25516-RNVN) Change 3082 Ben Weiner Dr to 2725 Ben Weiner Dr

    Permit
    21-27974-ECOA
    Type
    Change of Address
    Work
    Change of Address
    Estimated cost (applicant’s figure)
    $0
    Fees
    $0
    Days from application to issue
    0
    Expires
    Apr 6, 2022
    1. Application submitted
    2. Permit approved
    3. Issue date

    See this permit on One Stop

  172. Permit Electric Vehicle Charger: Electrical Permit Finaled

    Installation of a (5) EV battery charging station & electrical service in parking lot as per contract with Tulane customer

    Permit
    21-25063-EVCH
    Type
    Electric Vehicle Charger: Electrical
    Work
    Electric Vehicle Charger: Electrical
    Estimated cost (applicant’s figure)
    $171,125
    Fees
    $115
    Contractor
    Kevin Joseph Clark Sr.
    Days from application to issue
    31
    Expires
    Apr 28, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  173. Permit Mechanical HVAC In Review

    ROOF Install: 1-30 ton Air cooled chiller and 1-250,800 BTU air cooled outside air unit. Replaced: 5- Condensers (3-3 tons, 1-5 ton and 1-6 ton).

    Permit
    21-26591-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $569,076
    Fees
    $251
    1. Application submitted
    2. Application review
    3. Permit approved

    See this permit on One Stop

  174. Permit Mechanical Fuel Gas Permit Finaled

    2nd floor Install: 8-5KW each Elec unit heaters, 1-18KW Elec. Water Heater and 1-#8 Unfired pressure vessel.

    Permit
    21-26577-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $569,076
    Fees
    $205
    Days from application to issue
    5
    Expires
    Mar 27, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  175. Permit Mechanical Fuel Gas Other

    1st floor - nstall: 400' Gas line (UG), and 1-30KW Elec.duct heater.

    Permit
    21-26572-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $569,076
    Fees
    $76
    1. Application submitted
    2. Application review
    3. Permit approved
    4. First inspection

    See this permit on One Stop

  176. Permit Electrical Repair / Replacement / Addition Permit Issued

    Addition of roof panel to feed the relocation of Mechanical equipment. Installing new duct bank from new manhole under loading dock for New Science and Engineering Building.

    Permit
    21-26008-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $210,181
    Fees
    $205
    Contractor
    J J Boudreaux J J Kirk J
    Days from application to issue
    6
    Expires
    Mar 22, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  177. Permit Renovation (Non-Structural) Permit Issued

    12778860 TURCHIN - Antenna Mod; adding/replacing antennas, and ancillary equipment to existing facility.

    Permit
    21-25516-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $20,000
    Fees
    $220
    Contractor
    Mastec Network Solutions Karen Douglass
    Days from application to issue
    123
    Expires
    Jul 10, 2022
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  178. Permit Renovation (Non-Structural) Permit Issued

    10020775-Mercy Relo Antenna Mod; add/replace antennas, and ancillary equipment to existing facility.

    Permit
    21-25459-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $20,000
    Fees
    $160
    Contractor
    Mastec Network Solutions Karen Douglass
    Days from application to issue
    103
    Expires
    Jun 21, 2022
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  179. Permit Accessory Structure Other

    Temporary Press Box for Tulane University's Yulman Stadium.

    Permit
    21-23261-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $60,000
    Fees
    $420
    1. Application submitted
    2. Application review

    See this permit on One Stop

  180. Permit Moving Equipment Permit Finaled

    Installation Of Two ( 2 ) Buck Hoist For Use During Construction

    Permit
    21-22851-MOVG
    Type
    Moving Equipment
    Work
    Moving Equipment
    Estimated cost (applicant’s figure)
    $0
    Fees
    $570
    Contractor
    Woodward Desigh & Build LLC
    Days from application to issue
    0
    Expires
    Feb 6, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  181. Permit Accessory Structure Application Accepted

    Asking of continuance of Permit # 20-32961-ACCS for two more years. Tulane University would like to maintain 5 membrane structures in the quad area to implement social distancing. Only used when necessary for assembly. The rest of the structures will be removed that were erected will be removed.

    Permit
    21-21802-ACCS
    Type
    Accessory Structure
    Work
    Accessory Structure
    Estimated cost (applicant’s figure)
    $0
    Fees
    $60
    1. Application submitted

    See this permit on One Stop

  182. Permit Electrical Repair / Replacement / Addition Permit Issued

    Electrical work for renovation of a single tenant space at an existing food court.

    Permit
    21-20795-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $19,222
    Fees
    $100
    Contractor
    Henry Albert Rocker
    Days from application to issue
    0
    Expires
    Jan 19, 2022
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  183. Permit Renovation (Structural) Occupancy

    Alterations to Building 12 on Tulane University Uptown Campus in accordance with approved Institutional Master Plan. Alterations include adding 2 mechanical platforms to the roof of Building 12 and life safety modifications for duration of construction of the new science and engineering building.

    Permit
    21-20091-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $1,505,151
    Fees
    $9,096
    Contractor
    Broadmoor LLC
    Days from application to issue
    68
    Expires
    Mar 20, 2022
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  184. Permit Street Cut Other

    Perform two waterline hot taps and drainage tie in for the Tulane Housing Project.

    Permit
    21-18939-RSTC
    Type
    Street Cut
    Work
    Street Cut
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,342
    Days from application to issue
    8
    Expires
    Jan 8, 2022

    See this permit on One Stop

  185. Permit Sidewalk Repair Permit Cancelled

    Perform two waterline hot taps and drainage tie in for Tulane Housing Project.

    Permit
    21-18927-RSWR
    Type
    Sidewalk Repair
    Work
    Sidewalk Repair
    Estimated cost (applicant’s figure)
    $0
    Fees
    $20

    See this permit on One Stop

  186. Permit Dumpster/Construction Zone Other

    Construction Zone - Perform two waterline hot taps and drainage tie in for Tulane Housing Project. Exact location is Willow Street between Ben Weiner Drive and Janet Yulman/McAlister Drive.

    Permit
    21-18922-RCZD
    Type
    Dumpster/Construction Zone
    Work
    Dumpster/Construction Zone
    Estimated cost (applicant’s figure)
    $0
    Fees
    $500
    Days from application to issue
    16
    Expires
    Jan 16, 2022

    See this permit on One Stop

  187. Permit Driveway/ Curb Cut and Restoration Other

    Performing 2 water line hot taps and drainage tie in for the Tulane Housing Project.

    Permit
    21-18919-RDRV
    Type
    Driveway/ Curb Cut and Restoration
    Work
    Driveway/ Curb Cut and Restoration
    Estimated cost (applicant’s figure)
    $0
    Fees
    $100
    Days from application to issue
    16
    Expires
    Jan 16, 2022

    See this permit on One Stop

  188. Permit Renovation (Non-Structural) Application Accepted

    This project is a non-structural renovation of the administrative office spaces in Cudd Hall on Tulane's Campus.

    Permit
    21-18417-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $150,000
    Fees
    $960
    Contractor
    Chris Combs
    1. Application submitted

    See this permit on One Stop

  189. Permit Renovation (Non-Structural) Permit Cancelled

    This is a request for a renewal for permit # 20-45001-RNVN. There is no changes in the scope of work or valuation of the work. AT&T is proposing to upgrade its existing, wireless communication facility by installing new ancillary equipment – radios and antennas. See CD’s for detailed scope of work.

    Permit
    21-18169-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $25,000
    Fees
    $185
    1. Application submitted

    See this permit on One Stop

  190. Permit Renovation (Non-Structural) Occupancy

    Renovation of a single tenant space at an existing food court at Tulane University Lavin-Bernick Center (LBC) to suit new food service tenant. All work to be done as per plans.

    Permit
    21-17108-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $140,569
    Fees
    $906
    Contractor
    Mullins Brothers Construction Inc
    Days from application to issue
    31
    Expires
    Jan 15, 2022
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

    Placed here by its tax bill number from “20 McAlister Pl”.

  191. Permit Renovation (Structural) Permit Cancelled

    AT&T is proposing to upgrade its existing, wireless communication facility by installing new equipment - radios and antennas. See CD's for detailed scope of work.

    Permit
    21-16923-RNVS
    Type
    Renovation (Structural)
    Work
    Renovation (Structural)
    Estimated cost (applicant’s figure)
    $25,000
    Fees
    $245
    1. Application submitted

    See this permit on One Stop

  192. Permit Mechanical HVAC Permit Finaled

    INSTALL 7TH FLOOR; 38 FCUS; 17-FCUS DORM ROOMS, 5-FCUS BLDG USE A AREA AND 12-FCUS DORM ROOMS, 4-FCUS BLDG USE B AREA

    Permit
    21-14880-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $0
    Fees
    $795
    Contractor
    Andrew Barber
    Days from application to issue
    0
    Expires
    Nov 21, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  193. Permit Mechanical HVAC Permit Finaled

    INSTALL 6TH FLOOR; 38-FCUS; 15-FCUS DORM ROOMS 5-FCUS BLDG USE A AREA AND 14-FCUS DORM ROOMS, 4-FCUS BLDGUSE B AREA)

    Permit
    21-14878-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $0
    Fees
    $795
    Contractor
    Andrew Barber
    Days from application to issue
    0
    Expires
    Nov 21, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  194. Permit Mechanical HVAC Permit Finaled

    INSTALL 5TH FLOOR; 49 FCUS, 19-CUS DORM ROOMS, 5-FUCS BLDG USE A AREA AND 20-FCUS DORM ROOMS, 5-FUCS BLDG USE B AREA

    Permit
    21-14877-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,015
    Contractor
    Andrew Barber
    Days from application to issue
    0
    Expires
    Nov 21, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  195. Permit Mechanical HVAC Permit Finaled

    INSTALL ROOF; 4 water source DOAS.. (2-DOAS A AREA AND 2-DOAS B AREA)

    Permit
    21-14875-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $0
    Fees
    $170
    Contractor
    Andrew Barber
    Days from application to issue
    0
    Expires
    Nov 21, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  196. Permit Mechanical HVAC Permit Finaled

    INSTALL 4TH FLOOR; 50-FCUS, (19-FCUS DORM ROOMS, 5-FCUS BLDG USE A AREA AND 22-FCUS DORM ROOM, 4-FCUS BLDG USE B AREAS)

    Permit
    21-14870-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,035
    Contractor
    Andrew Barber
    Days from application to issue
    4
    Expires
    Nov 25, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  197. Permit Mechanical HVAC Permit Finaled

    INSTALL 3RD FLOOR; 50-VCUS, (19-FCUS DORM ROOMS, 5-FCUS, BLDG USE - A AREA AND 21-FCUS DORM ROOM, 5-FCUS BLDG USE B AREA)

    Permit
    21-14869-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,035
    Contractor
    Andrew Barber
    Days from application to issue
    4
    Expires
    Nov 25, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  198. Permit Mechanical HVAC Permit Finaled

    INSTALL 2ND FLOOR; 38 - FCUS, (18-FCUS DORM ROOMS, 3-FCUS BLDG USE-A AREA AND 9 FCUS DORM ROOMS, 8-FCUS BLDG USE) B AREA

    Permit
    21-14867-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $0
    Fees
    $795
    Contractor
    Andrew Barber
    Days from application to issue
    4
    Expires
    Nov 25, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  199. Permit Mechanical HVAC Permit Finaled

    Install 1 FIRST FLOOR ALL FOR BLDG. USE.; 7 AHUS, 31 VAVS, 11 FCUS, (3-AHUS, 24 VAVS,5 FCUS - A AREA AND 4 AHUS, 7 VAVS, 6 FCUS - B AREA)

    Permit
    21-14862-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,100
    Contractor
    Andrew Barber
    Days from application to issue
    4
    Expires
    Nov 25, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  200. Permit Mechanical Fuel Gas Permit Issued

    Install 2 - Steam Powered HWHS, 2 Exp.Tanks

    Permit
    21-14861-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $0
    Fees
    $90
    Contractor
    Andrew Barber
    Days from application to issue
    4
    Expires
    Nov 25, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  201. Permit Mechanical HVAC Permit Finaled

    Installation of two Electric Heat VAV Boxes

    Permit
    21-10575-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $97,710
    Fees
    $70
    Days from application to issue
    0
    Expires
    Oct 14, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  202. Permit Mechanical HVAC Permit Finaled
    Permit
    21-10432-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $94,472
    Fees
    $995
    Contractor
    Kenny Walters
    Days from application to issue
    5
    Expires
    Oct 19, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  203. Code enforcement Case ENVHADJ-98478SZ Closed

    The property was inspected on 12/04/1997 with a finding of "Complete". The file was subsequently closed.

    1. Inspection: Inspection Complete
  204. Code enforcement Case ENVHADJ-20005908F Closed

    The property was inspected on 10/31/2000 with a finding of "Complete". The file was subsequently closed.

    1. Inspection: Inspection Complete

    The city links this case to permit 26-31970-SLBN.

  205. Code enforcement Case ENVHADJ-200699F Closed

    The property was inspected on 07/28/2006 with a finding of "Complete". The file was subsequently closed.

    1. Inspection: Inspection Complete

    The city links this case to permit 26-31970-SLBN.

  206. Code enforcement Case ENVHADJ-931407HP Closed

    A hearing was held on 04/10/2009 with a result of "Dismissed". The case was subsequently closed.

    1. Hearing: Initial Hearing Dismissed
    2. Inspection: Inspection Complete

    The city links this case to permit 26-31970-SLBN.

  207. City record Renovation (Structural or Non-structural)

    Reconfiguration of one (1) working area for four (4) people to two (2) offices for a total of three (3) people.

    1. Permit Intake review Pending
    2. Parks and Parkways Tree Review review Pending
    3. Zoning review Pending
    4. Plan Review review Pending

    See this record on One Stop · checked Nov 16, 2026