Viavant - Venetian Isles

12550 Old Gentilly Road is in Viavant - Venetian Isles, zoned HI (Heavy industrial: higher-impact manufacturing and storage). The city has 16 permits on record here; the most recent, an electrical repair / replacement / addition permit, was filed in January 2021. 1 is still open. On this block in the past year: 2 requests to 311 and 5 calls to police.

Zoning
HI
Historic district
None
Council district
E
Ward
9
Lot size
2,284,941 sq ft
Parcel
51002191

Everything on record here

16 records, newest first · 1 open

  1. Permit Electrical Repair / Replacement / Addition Permit Issued

    Replace miscellaneous fixtures and devices. Label panel directory. Relocate miscellaneous fixtures

    Permit
    21-00395-ERPR
    Type
    Electrical Repair / Replacement / Addition
    Work
    Electrical Repair / Replacement / Addition
    Estimated cost (applicant’s figure)
    $74,203
    Fees
    $43
    Contractor
    Keith Descant
    Days from application to issue
    0
    Expires
    Jul 7, 2021
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date

    See this permit on One Stop

  2. Permit Interior Demolition Other

    interior Demo- Carpet, ceramic tile, acoustical ceiling, toilet partitions, cabinets.

    Permit
    20-44568-DEMI
    Type
    Interior Demolition
    Work
    Interior Demolition
    Estimated cost (applicant’s figure)
    $345,081
    Fees
    $1,790
    1. Application submitted

    See this permit on One Stop

  3. Permit Renovation (Non-Structural) Other

    Demo, new Paint, Acoustical ceiling tiles only, new carpet tile, new ceramic tile. new toilet partitions. new plumbing fixtures , New Electrical fixtures, New Cabinets and counter tops.

    Permit
    20-44463-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $345,000
    Fees
    $2,130
    Contractor
    C.D.W. Services
    1. Application submitted
    2. Application review

    See this permit on One Stop

  4. Permit Renovation (Non-Structural) Other

    Interior renovation and demo, Painting, carpet tile, changing acoustical ceiling tile only, change bathroom fixtures and toilet petitions. new cabinets

    Permit
    20-43812-RNVN
    Type
    Renovation (Non-Structural)
    Work
    Renovation (Non-Structural)
    Estimated cost (applicant’s figure)
    $345,081
    Fees
    $2,136
    Contractor
    CDW Services LLC
    Days from application to issue
    20
    Expires
    May 4, 2021
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  5. Permit Attached Sign Permit Issued

    Illuminated Monument Sign 32sqft Per Drawings Attached. To be installed at least 5ft from property line.

    Permit
    20-28651-SATT
    Type
    Attached Sign
    Work
    Attached Sign
    Estimated cost (applicant’s figure)
    $0
    Fees
    $270
    Contractor
    Pro Signs & Graphics
    Days from application to issue
    37
    Expires
    Dec 25, 2020
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop

  6. Permit Mechanical Fuel Gas Permit Finaled

    Gas lines with 10 outlets. Water Heater

    Permit
    20-21159-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $0
    Fees
    $57
    Contractor
    Kevin Rader
    Days from application to issue
    0
    Expires
    Sep 5, 2020
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  7. Permit Electrical Service / Circuit / Feeder Permit Issued

    NEW CONSTRUCTION 18-35572-NEWC INTERIOR BUILD OUT MIXED USE BUILDING

    Permit
    19-32884-SERV
    Type
    Electrical Service / Circuit / Feeder
    Work
    Electrical Service / Circuit / Feeder
    Estimated cost (applicant’s figure)
    $0
    Fees
    $1,358
    Contractor
    BRIAN JAMES BORDELON
    Days from application to issue
    0
    Expires
    Apr 15, 2020
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  8. Permit Mechanical Fuel Gas Permit Finaled

    1st Floor: Install 1- gas hot water heater, 2- gas lines, 1- exp. tanks, 3- electirc unit heaters, and 12- gas unit heaters

    Permit
    19-25755-FGAS
    Type
    Mechanical Fuel Gas
    Work
    Mechanical Fuel Gas
    Estimated cost (applicant’s figure)
    $0
    Fees
    $380
    Contractor
    Philip Garcia, Jr.
    Days from application to issue
    0
    Expires
    Feb 15, 2020
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  9. Permit Mechanical HVAC Permit Finaled

    1st floor: Install 3-AHUs, 12 VAVs, and 1- gravity hood

    Permit
    19-25754-HVAC
    Type
    Mechanical HVAC
    Work
    Mechanical HVAC
    Estimated cost (applicant’s figure)
    $0
    Fees
    $602
    Contractor
    Thomas Boudreaux
    Days from application to issue
    0
    Expires
    Feb 15, 2020
    1. Application submitted
    2. Application review
    3. Permit approved
    4. Issue date
    5. First inspection

    See this permit on One Stop

  10. Permit New Construction Occupancy

    Phase IV Entergy Michoud Substation Construction Drawings, this work is associated with the Previous submitted building Shell and Foundation project Ref Code 55SMDD, and the Entergy Michoud Power Plant Interior Build out project Ref Code EE31CN, and the Submittal for Accessory structures and pipe rack foundations and equipment pads 78YYF7

    Permit
    19-03392-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $5,100,000
    Fees
    $65
    Contractor
    Burns & McDonnell Engineering Company Inc
    Days from application to issue
    123
    Expires
    Dec 3, 2019
    1. Application submitted
    2. First inspection
    3. Application review
    4. Zoning review
    5. Plan review
    6. Permit approved
    7. Issue date

    See this permit on One Stop

  11. Permit New Construction Inspection Phase

    This Permit submittal is for Pipe Rack Foundations and Mech equipment foundations That are to be constructed for supporting equipment for the previously submitted entergy power producing station in Michoud. The associated project reference code 55SMDD

    Permit
    18-39604-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $0
    Fees
    $120
    Contractor
    Burns & McDonnell
    Days from application to issue
    114
    Expires
    Sep 27, 2019
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  12. Permit New Construction Occupancy

    Interior Build-out for for power producing plant in michoud. This application is in conjunction with the building shell and foundation permit #18-23813-NEWC Entery New Orleans Building Shell and Foundation Permits. The interior build out is a mixed us business/storage/Industrial use space.

    Permit
    18-35572-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $3,050,000
    Fees
    $18,360
    Contractor
    Burns & McDonnell
    Days from application to issue
    151
    Expires
    Sep 25, 2019
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  13. Permit New Construction Inspection Phase

    Entergy New Orleans Power Station - Building Shell and Foundation Permit Per Plans. No driveway scope of work. No use and occupancy under this permit.

    Permit
    18-23813-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $40,740,000
    Fees
    $244,500
    Contractor
    Burns & McDonnell Engineering Company Inc, timothy carey
    Days from application to issue
    200
    Expires
    Aug 4, 2019
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date
    7. First inspection

    See this permit on One Stop

  14. Permit New Construction Permit Cancelled

    Entergy New Orleans, LLC (ENO) is constructing the New Orleans Power Station in New Orleans, Orleans Parish, Louisiana. This new construction permit application will cover the pre-engineered manufactured building shell.

    Permit
    18-17501-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $2,300,000
    Fees
    $13,860
    1. Application submitted

    See this permit on One Stop

  15. Permit Driveway/ Curb Cut and Restoration Other

    Burns and McDonnell Engineering Company, Inc. is constructing the Entergy New Orleans Power Station located in New Orleans, Orleans Parish, Louisiana. During construction a driveway will be installed on the east side of the property to facilitate proper traffic flow in and out of the site.

    Permit
    18-17424-RDRV
    Type
    Driveway/ Curb Cut and Restoration
    Work
    Driveway/ Curb Cut and Restoration
    Estimated cost (applicant’s figure)
    $0
    Fees
    $165
    Days from application to issue
    14
    Expires
    Dec 7, 2018

    See this permit on One Stop

  16. Permit New Construction Permit Issued

    Entergy New Orleans, LLC (ENO) will be constructing the New Orleans Power Station (NOPS) in New Orleans East. This new construction permit will cover Phase I - Site Civil Grading, Storm Drainage, Wick Drains, and Erosion Control.

    Permit
    18-10231-NEWC
    Type
    New Construction
    Work
    New Construction
    Estimated cost (applicant’s figure)
    $0
    Fees
    $120
    Days from application to issue
    8
    Expires
    Oct 5, 2018
    1. Application submitted
    2. Application review
    3. Zoning review
    4. Plan review
    5. Permit approved
    6. Issue date

    See this permit on One Stop